FAX CO VER SHEET
To: Bill Pembroke From: Suzan Taylor
Fax: 214-696-3499 Date: May 19, 2004
Project No: ST 93-01 Sandy Lake E, Pages: 4 (including cover sheet)
Re: Oncor Pole Coordinates cc.,
[] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested
,Comments:
Attached is the information on the poles. Would you please forward plans sheets 16
and 17 to me once the pole locations are shown. This will expedite the relocation
process. I appreciate your help with this.
Suzan
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679
"City of Coppell Engtheerthg- Excellence By Design"
SCARBOROUGH ENGINEERING, INC.
3129 HANDLEY DR, FT. WORTH, TX 76112
Phone; 817~,51-6687; Fax: 817451-0476; E-Mail: don@seitexas.com
TO:
Ms. Suzan C. Taylor
C.I.P. Coordinator, City of Coppell
255 Parkway
P.O. Box 9478
Coppell, Texas 75019
LETTER OF TRANSMITTAL
DATE: JOB NO.
17-May-04
RE:
Sandy Lake Road, Project No. ST 93-01
Relocation of Oncor Transmission wood
pole(s)
WE ARE SENDING YOU [] Attached [] Under separate cover via the following items:
[] Shop drawings [] Prints [] Plans [] Samples [] Specifications
[] copy of,e..r [] C.a..e order []
COPIES ] DATE ] NO ] DESCRIPTION
Survey notes of Oncor poles relative to new Sandy Lake Road centerline and
pole coordinates tied to road design coordinates.
THESE ARE TRANSMITTED as checked below:
[] For approval [] Approved as submitted [] Resubmit
[] For your use [] Approved as noted [] Submit
[] As requested [] Returned for corrections [] Return
[] For review and comment r-']
[] FOR BIDS DUE [] PRINTS RETURNED AFTER LOAN TO US
copies for approval
copies for distribution
corrected prints
Remarks
Suzan,
Please use the attached pole coordinates to place these poles on your design drawings and help resolve two issues:
1) How far south will pole 4/3 need to be relocated to place it between new Back*of-Curb and new sidewalk (if one is built
This would place the pole in the same position as the other poles on this transmission line along Sandy Lake Road.
We have had locates done in the area of 4/3, with the exception of water and sewer, and found that choices for relocating
this pole are very limited.
2) Pole 4/4 may have to be relocated not for the road widening but for grading of a drainage ditch that is shown on your
drawings. The current location of this pole appears to place it right in the bottom of this proposed ditch. Hopefully by usin{
the coordinates to place it on your drawings you can tell me how far east it may need to be moved to remove it from the
ditch and place it on top of the slope.
Your cooperation in this matter is greatly appreciated. As soon as we can determine how these poles need to be adjusted,
this work can proceed so as not to hold up your construction plans and to allow Richard Brewster to adiust the Oncor
distribution poles. .
COPY TO: SIGNED: _
Suzan Taylor TRANSMIT.xls
FR~M :CORNERSTONE SURUEYINGiINC,
FAX NO.
~ 97~-845-~455
Ma~. 14 2004 07:25AM P3
FRO~ :CORneRSTONE SURU~YING~INC. FAX NO~ :97~-845-2455 Ma~. 14 20~ 07:25AM P~
STATION I NORTHING EASTING REMARKS
20+87.3 49492.5629 10041.6657 T-POLE & 4/1
23+99.80 49496.9573 t0354.1600 T-POLE & 4/2
28+78 49497.8107 10832.4007 PROPOSED T-POLE 4/3
33+85.55 49519.5200 11359.8631 T-POLE & 4/4
49520.0914 11314.3342 EXISTING GUY