Loading...
ST8402-CS 880830GINN, INC. C{}NSIIIiI'ING ENCHNEI,qRS August 30, 1988 Mr. Dave Snyder L.H. Lacy Company P.O. Box 541297 Dallas, TX 75354 Re: Denton Tap Road Improvements Sandy Lake to Denton Creek Coppell, TX Subject: Proposed Change Order No. 1 16" Waterline at Parkway Blvd. - REVISED Dear Dave: Please provide us with a proposal for the above referenced subject. We have enclosed a plan (Exhibit A) and a section (Exhibit B) for your use. The items required for the change order shall be furnished and installed in accordance with the contract documents and the attached exhibits. Total lump sum cost for this item shall include all work and materials necessary for furnishing and installing the water mains and appurtenances shown on the plan, including all excavation, dewatering, bracing and shoring, trench safety, bedding material, pipe laying, jointing, backfilling, compaction, thrust blocking, testing, disinfection and any other work that is required to complete the installation. Please complete the attached line item summary sheet, in duplicate, and return to us. Should you have any questions, or need additional information to prepare your proposal, please contact us. Sincerely, John C. Karlsruher, P.E. enclosure cc: i,Alan D~ Ra~ii~ Russell Doyle H. Wayne Ginn Randy Fleming Gabe Favre File 379 17103 Preston Road ® ,~uito 100 · I]1118 * I)allas, Tcxas 75248 * Phone 214/248-4900 / ~J O0'l 161 'H~ qq~d~ ZP+061 DE] ~1 '0~ + 06