Loading...
MA0405-CS040519Suzan Taylor - RE: Paver Replacement Page 1 of 2 From: "Scott Balch" <sbalch@bomanitent.com> To: "Suzan Taylor" <staylor@ci.coppell.tx.us> Date: 5/19/2004 2:56 PM Subject: RE: Paver Replacement CC: "Don Bruner" <dbruner@bomanitent.com> Suzan- By now you have a copy of our Budgetary Proposal for the items of work. While this is not a formal proposal we refer to it as a proposal so you understand the scope of our work. We have priced the work based on performing it during the weekend. We can also work up the numbers based on normal work week. We will forward this info to you. Thanks, Scott ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Wednesday, May 19, 2004 2:26 PM To: sbaich@bomanitent.com Subject: RE: Paver Replacement Scott We do not need a proposal for the project. We will have to bid the project. We just wanted a rough estimate of what it would cost for the stamped concrete per unit so that we could have an idea of what each intersection might cost. We wanted a cost for regular working hours and for weekend work. Thanks >>> "Scott Balch" <sbalch@bomanitent.com> 5/19/2004 1:44:41 PM >>> Susan- We are going through a final review of the plans and proposal for the project. We will have you a budgetary proposal this afternoon. Sorry for the delay. Thanks, Scott 3. Balch NTB Companies (p): 972-484-8465 (f): 972-48+8466 (m): 972-880-6835 http://www.bomanitent,com Notice: This message may contain copyrighted, privileged or other confidential information. If you are not the intended recipient or believe you have received this communication in error, please do not print, copy, retransmit, disseminate, or otherwise use the information. Also, please noti6/sender you have received this information in error, and then delete the copy you received. ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Thursday, May 06, 2004 1:04 PM To: sbalch @ boma nitent.com Subject: Paver Replacement file://C:~Documents%20and%20Settings\staylor\Local%20Settings\Temp\GW} 00002.HTM 5/19/2004 Page 2 of 2 Scott: Attached are the draft plans and specifications. Thanks for your assistance in this matter. file://C:~Documents%20and%20Settings\staylor\Local%20Settings\Temp\GW} 00002.HTM 5/19/2004 North Texas 113C. 11107 Morrison Lane, Dallas, Texas 75229-5608 Phone: 972-484-8465 Fax: 972-484-8466 For Your Information To: Suzan Taylor Fax Number: 972-304-3570 Company: City of Coppell Date: 5/19/2004 From: Scott Balch Fax Number: 972-484-8466 Company: North Texas Bomanite, Inc. Pages including cover page: 2 Subject: Brick Paver Replacement Comments: Suzan- As you can see, we priced only one intersection. The unit prices would extend to the other work. Please call Don Bruner or myself if you have any other questions. Thanks, Scott WinFax PRO Cover Page NORTH TEXAS BOMANITE, INC. BUDGETARY PRICING May 19, 2004 North Texas Bomanite, Inc, hereinafter referred to as "NTB" proposes to furnish all labor, materials and equipment required for the performance of the work described below ~n connection with construction of improvements at "Brick Paver Replacement Program", Coppell, TX All work will be performed in accordance with plans and specifications provided by the City of Coppell for the considerations shown: Item Description Unit Estimated Unit Price Total Quantity A. MacArthur Boulevard / Riverchase Drive A-1 Mobilization & Demobilization LS 1 $1,800 00 $1,800 00 A-2 Brick Paver Removal SY 269 $11 00 $295900 A-3 Concrete Pavement Removal SY 264 S3500 $9,240 00 A-4 8" Concrete Pavement SY 22 $70 00 $1,540 00 A-5 8" Color Texturized Concrete SY 242 $105 00 S25,410 00 A 6 Flexible Base SY 221 $13 05 $2,884 05 A-7 Brick Paver Replacement SY 6 $150 00 $90000 A-8 Implementation of Traffic Control Plan LS 1 $2,17500 $2,17500 Total $46,908 05 The foregoing proposal is based on the following SPECIAL CONDITIONS: 1 No allowance has been made for Permits, caulking, repair or patching of existing concrete (other than that shown on the plans) 2 All Bomanite, Bomacron, Patene Artectura and Grasscrete work will be performed in accordance with the standard specifications of the Bomanite Corporation Bomanite, Bomacron, Patene Artectura and Cemento Frescos~ Coloring Systems are constructed from concrete under varying conditions and subject to color and geometric variations These variations are intrinsic to the product and considered to be a part of the aesthetic appeal 3 Item A 6 is based on installing Flexible Base material in lieu of the proposed Cement Treated Base North Texas Bomanite, Inc ScottJ Balch President C \My Files\Corel & Word\Documents\Proposals NTB\Municipal\Brick Replacement Coppe[I- Budgetao~ Proposal wpd 11107 MORRISON LANE · DALLAS, TEXAS 75229-5608 · 972-484-846;5 · FAX 972-484-8455