Loading...
ST9401-CS 950221Texas Department of Transportation RO. BOX3067.DALLAS, TEXAS75221-3067-(214) 320-6100 12000 Greenville Avenue, Dallas, Texas 75243-3506 February 21, 1995 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Control: 3547-02-003, 3547-03-002 Highway: SH 121 Bypass (Phase I) From SH 121 at Denton Creek To Denton Tap Road County: Dallas, Denton Mr. Ken Griffin: We are providing your office with a copy of the revised proposed alignment of Culvert S-5 for the referenced project. This plan sheet will replace sheets #40 and #67 of the plans adequate sent to you earlier this month. Currently, the plans adequate depict a culvert exiting out into a two feet by six feet flume and cutting across Vista Mortgage Properties. This open drainage would require a metal beam guard rail for approximately seven hundred feet along the east side of Denton Tap Road. We feel that there is a more feasible option. We would like to propose for your consideration a closed drainage system along Denton Tap Road from SH 121 Bypass to Denton Creek. In order for this to occur, it would require your assistance in providing the necessary design details beyond the end of our .proposed culvert. In addition, the City of Coppell would be required to provide the funding to obtain the materials and construct the length of culvert to the Denton Creek outlet. If you consider this as a viable option, please submit an official written request to this office by March 20, 1995, stating that you would be willing to provide the necessary funds prior to the letting of the referenced project. The additional culvert length could then be built with the referenced project. An Equal Opportunity Employer Just as a note, we would like to make mention of a thirty inch water line owned by Dallas Water Utilities (DWU) that is currently located under the ditch on the east side of Denton Tap Road. We have intentions of coordinating our efforts in such a manner that the utility would only have to be designed and moved once. DWU is currently working with the City of Lewisville as they are designing Denton Tap Road to the north of the bypass. For your information, we are providing you with the proposed discharges of the drainage design. We would appreciate your reviewal and concurrence at your earliest possible convenience. Should you have any questions or require further clarification, please feel free to contact Mr. Kenneth J. Shirley at the above address or at telephone number (214) 235-7797. Cordially, C. Smith Jones, P.E. Area Engineer Attachments PROPOSED DISCHARGES IN THE DENTON TAP ROAD VICINITY CI-U14 LINE U INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-U1 U1 3.91 CI-U2 U2 3.03 CI-U3 U3 2.89 CI-U4 U4 2.89 CI-U5 U5 2.89 CI-U6 U6 2.89 CI-U7 U7 2.92 DI'U8 U8 14.06 CI-U9 U9 2.76 CI-U10 U10 2.20 CI-Ull Ull 3.36 CI-U12 U12 1.80 CI-U13 U13 2.62 i 3.26 LINE W INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-W1 W1 4.35 CI-W2 W2 4.35 DI-W3 W3 16.83 CULVERT S-5 W4 & W5 546.12 (25YR) LINE X INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-Xl X1 4.35 CI-X2 X2 4.15 CI-X3 X3 3.51 CI-X4 X4 4.48 DI-X5 X5 7.82 DI-X6 X6 58.28 U14 LINE Y INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-Y1 Y1 0.43 CI-Y2 Y2 0.93 CI-Y3 Y3 0.93 CI-Y4 Y4 1.30 CI-Y5 Y5 2.91 CI-Y6 Y6 2.36 LINE Z INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-Zl Z1 4.39 CI-Z2 Z2 3.41 LINE AA INLETS AND DISCHARGES INLET DRAINAGE AREA DISCHARGE (CFS) CI-AA1 AA1 2.42 CI-AA2 AA2 1.98 CI-AA3 AA3 3.74 CI-AA4 AA4 2.39 CI-AA5 AA5 2.36 Note: Ail curb inlets and drop inlets are designed on a 5 year storm interval with a minimum time of concentration of 10 minutes using Dallas County constants.