Four Seasons 2R-CS040506DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITE]~
Four Seasons Addition~ Lot 2R, (BCE Specialties~ lnc.)~ Replat~ being
a replat of Lot 2 of the Four Seasons Addition, to allow the construction of
an approximate 56,750-square-foot office/~varehouse on 4.1 acres of
property located along at the southeast corner of Sandy Lake Road and
Royal Lane, at the request of C. Jack Evans, Pachcco Koch Consulting
Engineers.
STAFF REP.: Matt Steer PROJECT ID# RP-04-0020
DRC DA TE: April 29, 2004 and May 6,2004
CONTA CT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Pt/orks 972/304-3686
COMMENTSTATUS: PRELL~!La?ARY ~FI,~4L RE!qSED
AFTER P&Z
Plat
No comments.
Preliminary Grading Plan -
1. Regarding the note that says "Contractor to obtain permission in writing from property owner
prior to commencing offsite grading work"...the City will need that written pern~ission
before the permit is issued.
2. There is an existing inlet at a iow point in Royal Lane where you are showing to construct
your driveway. Due to the ~Cact that it is a low point, the driveway should be relocated to
avoid the inlet.
Preliminary Drainage Plan -
1. Relocate driveway out of the way of the low point inlet in Royal Lane.
2. The timing of this project needs to be taken into consideration with the timing for the Sandy
Lake Road widening project. We expect that the road will be under construction beginning
in October of this year. If the drainage that is to be constructed with that project is not in
place, you will need temporary headwall structures on your outfalls, and some type of
temporat3' bridge structure for your driveways. Alternatively, you can construct the
driveways at a later date, but at any rate, coordination is a must for these projects.
Additional comments may be generated duringr full engi~leering review.
DE VEL OPMENT RE VIE W COMMITTEE
ENGINEERING COMMENTS
ITEM:
Four Seasons Additiom Lot 2R~ (BCE Specialties~ lnc.)~ Site Plant to
allow the construction of an approximate 56,750-square foot
office/warehouse on 4.1 acres of property located at the southcast comer
of Sandy Lake Road and Royal Lane, at the request of Kyle
McCullah/MLM Architects, inc.
STAFF REP.: Matt Steer PROJECT iD# SPA-04-0019
DRC DA TE: April 29, 2004 and May 6,2004
CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COYlMENT S TA TUS:
,,/FINAL
comments related to site issues on the plat case.