Four Seasons 2R-CS040520CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Four Seasons Addition~ Lot 2R (BCE Specialties, Inc.), Replat P & Z HEARING DATE: C.C. HEARING DATE: May 20, 2004 June 8, 2004 STAFF REP.: Matt Steer, City Planner LOCATION: Southeast corner of Sandy Lake Road and Royal Lane. SIZE OF AREA: 4.1 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Replat approval to allow the construction of an approximate 56,750-square-foot office/warehouse. APPLICANT: Owner Beth Cunningham 2860 Market Loop Southlake, TX 76092 Phone: (817) 949-2030 Fax: (817) 488-9158 Architect Hardy McCullah/MLM Architects, Inc. Kyle McCullah 12221 Merit Drive, Suite 280 Dallas, TX 75251 Phone: (972) 385-1900 Fax: (972) 385-1937 Engineer Pacheco Koch Consulting Engineers C. Jack Evans 8350 N Central Expressway, Suite 1000 Dallas, TX 75206 Phone: (972) 235-3031 Fax: (972) 235-9544 Page 1 of 3 Item #11 HISTORY: TRANSPORTATION: In 1990, a Final Plat and Site Plan were approved for a 13.7-acre tract of property. The original plans included the construction of a 152,000-square-foot building (existing) and a proposed Phase 2 expansion to include a 138,000-square-foot building on the property adjacent to Sandy Lake Road, which was never constructed. In 1999, City Council approved a replat for the northern 4.1 acres to make this tract a separate lot. This approval was subject to a condition that any modification to the existing building would require a site plan review and a replat. Both Royal Lane and Sandy Lake Road are projected to be C4D/6, four-lane divided thoroughfares in a six-lane divided right-of-way. SURROUNDING LAND USE & ZONING: North- Vacant, LI (Light Industrial) South - Stone Panels, Inc., LI (Light Industrial) East - AmberPoint Business Park, LI (Light Industrial) West - Vacant, LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom. DISCUSSION: Page 2 of 3 This is a 4.1-acre replat of the Four Seasons Addition, Lot 2. A 56,750- square-foot office/warehouse is proposed. BCE Specialties, Inc., an elevator finishing company, will be the pr/mary tenant and occupy 22,555- square feet. The business does the interior finish-out of elevators, then ships them to their final destination. The remaining six lease spaces will range from 5,000- to 7,445-square feet, and the tenants are currently unknown. There are three proposed ingress/egress points (two from Sandy Lake and one from Royal). The access point along Royal is shown at the south end of the property, but will have to be relocated due to drainage concerns regarding the location of a storm water inlet. The fire lane easement encircles the building and is accessible off two of the three ingress/egress points. The location of the fire lane easement will be need to be revised to reflect the access point relocation along Royal. It will be reevaluated by the Fire Marshal to ensure conformance with the City of Coppell standards. There is a 24' access easement depicted on the northeast corner Item # 11 of the property. This will need to be extended to connect with the fire lane and be renamed a fire lane and access easement. There are other minor technical details outlined in the plat conditions. After those are met, the subdivision will meet the Subdivision Ordinance requirements. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of the Replat, subject to the following conditions being met: 1) Extend access easement located on the northeast corner of the plat to the proposed fire lane easement, and rename to "fire lane and access easement." 2) Clearly identify the fire lane easement (shade or bold). 3) Change the Flood Plain Administrator's signature block to read 2004 in place of 2003. 4) Exclude the specific names under the signature blocks of the utility providers. 5) Show bearings and distances of the fire lane and drainage easements. 6) Indicate turning radii for fire lane (30' inside, 54' outside are the minimum required). 7) Compliance with the attached Engineering comments. ALTERNATIVES 1) 2) 3) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request ATTACHMENTS: 1) Final plat 2) Engineering Comments Page 3 of 3 Item # 11 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Four Seasons Addition, Lot 2R (BCE Specialties, Inc.), Site Plan P & Z HEARING DATE: C.C. HEARING DATE: May 20, 2004 June 8, 2004 STAFF REP.: Matt Steer, City Planner LOCATION: Southeast corner of Sandy Lake Road and Royal Lane. SIZE OF AREA: 4.1 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Site Plan approval to allow the construction of an approximate 56,750-square-foot office/warehouse. APPLICANT: Owner Beth Cunningham 2860 Market Loop Southlake, TX 76092 Phone: (817) 949-2030 Fax: (817) 488-9158 Architect Hardy McCullah/MLM Architects, Inc. Kyle McCullah 12221 Merit Drive, Suite 280 Dallas, TX 75251 Phone: (972) 385-1900 Fax: (972) 385-1937 Engineer Pacheco Koch Consulting Engineers C. Jack Evans 8350 N Central Expressway, Suite 1000 Dallas, TX 75206 Phone: (972) 235-3031 Fax: (972) 235-9544 Page 1 of 4 Item # 10 HISTORY: TRANSPORTATION: In 1990, a Final Plat and Site Plan were approved for a 13.7-acre tract of property. The original plans included the construction of a 152,000-square-foot building (existing) and a proposed Phase 2 expansion to include a 138,000-square-foot building on the property adjacent to Sandy Lake Road, which was never constructed. In 1999, City Council approved a replat for the northern 4.1 acres to make this tract a separate lot. This approval was subject to a condition that any modification to the existing building would require a site plan review and a replat. Both Royal Lane and Sandy Lake Road are projected to be C4D/6, four-lane divided thoroughfares in a six-lane divided right-of-way. SURROUNDING LAND USE & ZONING: North- Vacant: LI (Light Industrial) South - Stone Panels, Inc., LI (Light Industrial) East - AmberPoint Business Park, LI (Light Industrial) West - Vacant: LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom. DISCUSSION: Page 2 of 4 A 56,750-square-foot office warehouse with seven lease spaces is proposed to be erected on this 4.1-acre site. The primary tenant will be BCE Specialties, Inc., an elevator finish-out company (occupying 22,555- square feet). The remaining six lease spaces will range from 5,000- to 7,445-square feet. The tenants are upXnown at this time. There are three 9'x10' sheltered dock high doors (four feet above ground level) located on the southeast comer of the proposed warehouse to support BCE Specialties, Inc. Each of the smaller lease spaces will have one 10'xl0' grade-level overhead door. These are designed for smaller trucks. All loading will be screened with a 10' wall on the east and west and with landscaping (45 Eastern Red Cedars and 18 Cedar Elms) along the south property line. The access point and median opening along Sandy Lake are being coordinated with the developers to the north. The access point along Royal is shown at the south end of the property but will have to be Item # 10 relocated due to drainage concerns regarding the location of a storm water inlet. The parking space requirement is calculated with the inclusion of 27,600-square-feet of office space. The building total usage will be limited to 49% office space with the remainder to be warehousing. The Landscape Plan should be modified to reflect the Streetscape Plan and should reflect certain criteria related to the following: 1. Primary Image Zone, 2. Secondary Intersection, and 3. Industrial land use. Within the primary image zones, "Cedar Elms are the dominant street tree in the median and the edges, accented with Redbud and Wild Plum and accent overstory trees of Sweet Gum or Chinese Pistache." The secondary intersection should have "consistent landscape elements to include a 12" high planting bed for annual and perennial flowers, background plantings of pink and white Crape Myrtles to highlight the bed, and accent overstory trees of Sweet Gum and Chinese Pistache." The edge design should reflect an industrial land use. This calls for Live Oaks to "soften the edge and provide year-round screening." Approval will be contingent upon the Landscape Architect revising the plans. The elevations show two shades of gray with aqua accent squares. Staff requested the applicant to show additional reveals, articulations and windows along the north elevation due to the size of the building and its frontage on Sandy Lake. The Zoning Ordinance makes this a requirement if a building exceeds 100' in length. The entrance fronting the intersection of Sandy Lake and Royal is recommended to be enhanced as this is one of the major entryways into Coppell. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: The Planning staff recorrm~ends APPROVAL of the Site Plan, subject to the following conditions being met: 1) Revise the 60' building setback with parking easement shown in the wrong location parallel with the jog in the property line. 2) Include all dimensions of the property. 3) Due to frontage onto Sandy Lake, a Primary Image Zone, show additional architectural accents to break up the expanse of the wall. Page 3 of 4 Item # 10 These may include items such as reveals, windows, and wall articulations, among others. 4) Enhance the entrance abutting Sandy Lake and Royal. s) The Landscape Plan should be modified to reflect the Streetscape Plan and should reflect certain criteria related to the following: a. Primary lmage Zone, b. Secondary Intersection, and c. Industrial land use. 6) A Tree Removal Permit will be required prior to removal of any protected trees on the site. 7) Tree Mitigation Tabulations on Existing Tree Plan are correct. A contribution to the City of Coppell Reforestation and Natural Areas Fund in the amount of $18,650.00 will be required. 8) Compliance with the attached Engineering plat comments. ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recomanend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 5) Site Plan Elevations Tree Survey Landscape Plan Engineering Plat Comments Page 4 of 4 Item # 10