Sandy Lk Cross 2R-CS040506DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Sandy Lake Crossing Addition~ l.ot 2R~ Block 1~ Replat, being a replat
of Lot 2, Block I of the Sandy Lake Crossing Addition, to allow the
construction of an approximate 7,200-square-£oot retail building on 0.737
of an acre of property located along thc south side of Sandy Lake Road,
approximately 200 feet west of Denton Tap Road, at the request of
Thomas J. Whan, Creekside Construction Ltd.
STAFF REP.: Marcie Diamond PROJECT ID# RP-04-002d
DRC DA TE: April 29, 2004 and May 6,2004
CONTA CT:
COMMENT STATUS:
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Worlds 972/304-3686
'/FINAL
1. Provi' edg~'-s 'a ease ne.
Utilities Plan -
1. Provide one tap to the 8" water kine with the domestic and i~Tigation taps off the 8" water
line. The fire line vault needs to be in a 15' x 15' utility easement.
Additional comments may be generated and a need for additional easements ma),' be identified as
a result Qfa detailed engineering review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Sandy Lake Crossing Addition~ Lot 2R~ Block 1, Site Plan, to allow the
construction of an approximate 7,200-square-foot retail building on 0.737
of an acre of property located along the south side of Sandy Lake Road,
approximately 200 feet west of Denton Tap Road, at the request of
Thomas J. Whan, Creeksidc Construction Ltd.
STAFF REP.: Marcie Diamond PROJECT ID# SPA-04-0023
DRC DA TE: April 29, 2004 and May 6,2004
CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineerh~g/Public Works 972/304-3686
COMMENTSTATUS: ~v~t t~ o~ ~FINAL j ~ .....
See next case (replat) for additional site plan comments.