ST9401-CS 950120WIER & ASSOCIATES, INC. January 20, 1995 Wes Rudd Lone Star Gas Company 1931 E. Sixth St. Irving, TX 75060 214/579-0232 RE: W&A #94093 ~ DENTON TAP ROAD; Coppell, Texas Dear Mr. Rudd: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designing provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 214/304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will forward to you copies of the construction plans so you may verify potential impacts to your facilities. Mr. Wes Rudd W&A #94O93 January 20, 1995 Page 4 of 2 After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Thank you for assisting us in design of Denton Tap Road. Very truly yours, ULYS~NE III, P.E., R.P.L.S. Executive Vice President WIER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin WIER & ASS[]IGIATES, INC. January 20, 1995 Phill Boyd Wholesale Services Representative Dallas Water Utilities City Hall Room 4AN 1500 Marilla Street Dallas, TX 75201 214/670-5887 Dear Mr. Boyd: RE: W&A #94093 - DENTON TAP ROAD; Coppell, Texas We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We will need to verify the horizontal and vertical alignment of the existing 30" water line along the east line of Denton Tap Road. At this time we have identified the major potential conflict locations to be at the proposed east bridge crossing and a proposed Culvert Crossing location 800'+ north of Denton Creek. We are working with Richard Karrey and Steve Loyd to roughly locate the line horizontally. We believe most potential conflicts can be confirmed by probing. The bridge crossing is extremely crucial and we anticipate the water line should be uncovered just north and south of Denton Creek in an existing tangent section. We will continue coordinating with Steve Loyd to locate the existing line. Our goal will be to attempt to miss the existing 30" water line but we cannot confirm the impacts to your line at this time. We look forward to working with you and are available to meet at your convenience. UTL:rjt Enclosures cc: Ken Griffin, City of Coppell pyOUrS, .L.S. Executive Vice President Randy Nelson, Dallas Water Utilities with enclosures Steve Loyd, Dallas Water Utilities with enclosures !~ r T ¥ T ~WIEI~ & ASSOI~IATES, INC. MEMO Of CONVERSATION REMARKS: o..: /-/1---') 5 TIME: ~ INITIALS: ~ ROUTE TO: RECEIVED CALL ~r ~t '~0 '!*~'/~/~-~ D ~ PLACED~ MEETIN'ATCALL TELEPHONE NO.__ ;/~ ' C~ ~~NED CALL JO '~~ JOB NO. WIER & ASSOCIATES, INC. January 20, 1995 Melba Smith Lone Star Gas Company 2000 Reliance Drive Bedford, TX 76021 817/283-7466 RE: W&A #94093 - DENTON TAP ROAD; Coppell, Texas Dear Ms. Smith: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designin9 provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 214/304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will forward to you copies of the construction plans so you may verify potential impacts to your facilities. w f T T' Ms. Melba Smith W&A #94093 January 20, 1995 Page 2 of 2 After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Thank you for assisting us in design of Denton Tap Road. Very truly yours, ULYS LANE III, P.E., R.P.L.S. Executive Vice President WIER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin WIEI~ & ASSOI~IATES, INC. January 20, 1995 Bill Morgan Paragon Cable 209 S. Rogers Irving, TX 75060 214/259-9903 RE: W&A #94093 - DENTON TAP ROAD; Coppell, Texas Dear Mr. Morgan: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We have contacted Paragon Line Locate in that regard. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designing provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 214/304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. We noted a conduit on the east side of the existing bridge which serves a cable line. We anticipate the existing bridge will be replaced by two 3-lane separated bridge built in phases. We will need to coordinate relocation of the conduit before removal of the existing bridge. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will Mr. Bill Morgan W&A #94093 January 20, 1995 Page 12 of 2 forward to you copies of the construction plans so you may verify potential impacts to your facilities. After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Thank you for assisting us in design of Denton Tap Road. Very truly yours, ~0"'Lys ~AN¢: Ill, P.E., R.P.L.S. Executive Vice President WIER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin WlER & AEiSOBIATB3, INC. January 20, 1995 Mae Beth Wahley GTE Telephone Operations Central Area 2094 McGee Lane Lewisville, TX 75067 214/318-3832 RE: W&A #94093 - DENTON TAP ROAD; Coppell, Texas Dear Ms. Wahley: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We have contacted Digg Test in this regard. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designing provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 214/304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. We noted several fiberglass conduits are mounted on the west side of the existing bridge. We anticipate the existing bridge will be replaced by two 3- lane bridges built in phases. We will need to coordinate conduit relocations to conform to the phased construction of the proposed bridges. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will Ms. Mae Beth Wahley W&A #94093 January 20, 1995 Page 10 of 2 forward to you copies of the construction plans so you may verify potential impacts to your facilities. After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Thank you for assisting us in design of Denton Tap Road. We look forward to working with you on this project. Very truly yours, ULYS LANE III, P.E., R.P.L.S. Executive Vice President WIER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin WlER & AEiEiOI~IATES, INC. January 20, 1995 James Stuart Sprint 2511 Grauwyler Irving, TX 75061 214/506-1953 RE: W&A#94093 - DENTON TAP ROAD; Coppell, Texas Dear Mr. Stuart: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a Mapsco sheet is enclosed which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designing provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 2141304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will forward to you copies of the construction plans so you may verify potential impacts to your facilities. Mr. James Stuart W&A #94093 January 20, 1995 Page 8 of 2 After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Thank you for assisting us in design of Denton Tap Road. Very truly yours, ULYS LANE III, P.E., R.P.L.S. Executive Vice President WlER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin WIER & ASSOIglATES, INC. ENGINEERING SUEVEYING LAND PLANNING January 20, 1995 Tim Brancheau TU Ele~ric 1440 Josey Lane Farmers Branch, TX 75234 214/888-1307 RE: W&A #94093 - DENTON TAP ROAD; Coppell, Texas Dear Mr. Brancheau: We have been contracted by the City of Coppell to design roadway plans for widening Denton Tap Road from a two-lane county road to a six-lane divided arterial street. The plans will begin at the north city limits line and extend to the south across Denton Creek to the existing improved roadway section. A copy of a rough concept plan is attached which indicates the approximate location of the proposed roadway. We are performing design surveys and ask that you assist in marking your existing underground facilities by January 27, 1995, if possible. We would like to obtain any plans you may have which indicate the horizontal and vertical alignment and size of your facilities. If you have plans for installation of future underground facilities we would also like to obtain a copy of the plans. We will attempt to avoid your facilities where possible based on the information you provide to us. We will be designing a bridge crossing over Denton Creek and may need to coordinate designing provisions for installation of conduits connected to the bridge for your relocated or future facilities. Please contact Mr. Ken Griffin with the City of Coppell at 214/304-3683 if you wish to coordinate provisions which will allow placement of conduits on the proposed bridge. At this time we cannot confirm locations where underground facilities may need to be uncovered to confirm potential conflicts. We will contact you in the future if uncovering of lines are needed. We will be preparing concept plans, preliminary plans and final plans on the project. At each of these phases we will forward to you copies of the construction plans so you may verify potential impacts to your facilities. Mr. Tim Brancheau W&A #94093 January 20, 1995 Page 6 of 2 We will also need to coordinate with you to install conduits for street lights placed prior to pavement construction. Our initial observations lead us to believe there is an overhead line along the west side of the roadway. The existing bridge will be removed and two 3- lane bridges will be built in phases. It appears that the existing overhead line will need to be relocated to the west prior to construction of the west proposed bridge. After you have reviewed this letter and information, please contact me to confirm marking of underground facilities and to confirm the contact person with your company we should coordinate with in the future. Please forward this information to the correct TU Electric representative if you will not be coordinating the project. Thank you for assisting us in design of Denton Tap Road. Very truly yours, ULYS LANE III, P.E., R.P.L.S. Executive Vice President WlER & ASSOCIATES, INC. UTL:ckw Enclosures cc: Mr. Ken Griffin