Loading...
SS0201-CS040524P.O. Box 478 255 Parkway Bird Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Jay Canafax From: Suzan Taylor Fax: 214-630-9819 Date: May 24, 2004 Project No: SS 02-01 Pages: 2 (including cover sheet) Re: Materials Testing cc: [] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested .Comments: The inspector for the project reviewed the proposal and requested that the cimled items be increased. He thinks that there may be several pours for the piers. The City does not pay for any overtime - that is the contractor's responsibility. Please remove the overtime from the proposal. There will be a preconstruction meeting on May 27, 2004 at 9:00 am in the 2nd floor conference room at Town Center. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 City of Coppell Engmeermg- Excellence By Destgn May 20, 2004 PropoSal No. 04-6257 RONE ENGINEERS, LTD. Construction Matertals Engineering and Testing Basic Services a~d Cost Estimate Project: Sevv/ce Center sam~aw Sewer Line DESCRIPTION Estimated Quantity Unit Rate Estimated Total EARTItVqORK Moisture Density Relationship ASTM D 698 (each) Agrerberg Limits (each) Eng/neer/ng Technician (hourly) In Place Density Test (each) 10.0 $130.00 $40.0O $27.50 $13.00 $13.00 Transporta~-ion Clxarge (trip) En ' eering & Report Review (hourly) As~ag~m~dons: 1 dcasity t~t for e'/ery 150 feet °f util½p] french back-qll p~r uti' PIER INSPECTION Senior Engineering Technician (hourly) Senior Engineering Techmctan Oyertnn~ ~ Concrete Test Cylinders (each) Iranspormtion Charge (mp) Engineering & Report Review (hourly) Assumptions: 1 day of pier drilling wi~h one technician and I dr/fling rog. $390.00 $120.00 $687.50 $1,560.00 $130.00 $319.00 CONCRETE Concrete Inspection (hourly) Concrete Test Cylinders (each) Reinforcing Steel InspeCtion (hourly) Transportation Charge (trip) Engineering & Report Review (hourly) Assmnpfions: ~ set of 4 concrete te~t cylinders for every 100 yards of concrete placed. Concrete Inspection time is based on delivery of concrete at 10.0 $35.00 $350.00 0 $52.50 $105.00 7b~y $13.00 $52.00 $~3.00 : $26.00 0.$ $0 00 $0.00 11.0 $27.50 $302.50 12-0 $1300 $156.00 $13_00 $52.00 ~0~ $55.00 $99.00 50 yards per hour. Page 2 of 3