Loading...
SS9901-CS040514· :M a sTe c May 14, 2004 Kenneth M. Griffin, P.E. Director of Engineering & Public Works 255 Parkway Coppell, Texas 75019 RE: Deforest Road Lift Station Improvements Force Main Line Project #SS 99-01 Dear Mr. Griffin: In response to your letter dated May 12, 2004 regarding the award of Bid/Contract #Q-1203-01, please find below our written response to the two items that arose during the city council meeting. MasTec North America, Inc. has retained the services of Norman Tarney from Edmonton, Alberta, Canada to be the equipment operator on this project. At this time the work visa documents have been submitted to allow Mr. Tarney to be employed for this project. As you are aware, Mr. Tarney has vast experience with equipment of the nature and will be a great asset to the project. MasTec North America, Inc. will complete improvements adjacent to the elementary school during the summer months of 2004. Doing this work during this time frame will minimize disruption to school activities and minimize safety concerns which the presence of small children may create. This work includes work between station 15+73.84 to approximately 27+00. Thank you for the opportunity to respond to the two items requiring clarifications. Should you have any questions or require clarification feel free to contact me at (214) 571-2527. David Holland Senior Vice President ,,lMasTec North America Inc 4747 Irving Blvd Suite 221 Dallas Texas 75247 · 214 571 2500 fax 214571 2555 wwwmasteccom