Loading...
WA0101-CS040525BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 JOHN W. BIRKHOFF, P.E. RONALD v. CONWAY. P.E. GARY C. HENDRICKS, P.E JOE R. CARTER, P.E. PAUl. A. CAP. LINE, PE MATT HICKEY, P.E. DOUGLAS K. SHOWERS, P.E. Dallas, Texas 75231 Fax (214) 361-0204 May 25, 2004 Phone(214)361-7900 Ms. Suzan C. Taylor, C.I.P. Coordinator City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: State Highway 121 Water Line (Coppell Road to Denton Tap Road) Project No. WA 01 - 01 Permanent and Temporary Easements Dear Ms. Taylor: Please find enclosing two sets each of the plats and field note descriptions for the permanent water line easement and the temporary construction easement required for construction of the State Highway 121 Water Line (Coppell Road to Denton Tap Road). The easements included cross the following property: SCI Denton Tap Ltd., P.S. Volume 99106, Page 7729 (LR of DC) These easement descriptions are marked as preliminary at this time. We are finalizing the reference bearings prior to submitting them to our R.P.L.S. for seal and signature. We are available to discuss this project further at your convenience. Sincerely y~ ~ers, P.E.. Enclosures