Loading...
SS9901-CS040521· :M a sTe c May 21, 2004 Kenneth M. Griffin, P.E. City of Coppell 225 Parkway Blvd Coppell TX, 75019 Fax 972-304-3673 Re: Deforest Road Lift Station Improvements Force Main Line "D" Project # SS 99-01 Dear Mr. Griffin, Please find attached (3) Executed Contracts for the project listed above. Bonds and Insurance are attached inside each contract. At this point, the tentative date for the pipe to be delivered is the week of June 14% If you have any questions please feel freeto contact Roger Cole at 214-543-4936 or David Holland at 214-571-2527. Thank you for giving MasTec North America, Inc. the opportunity to work with you on this project. We look forward to working with The City of Coppell in the future. Feel free to contact me with any comments or questions at 214-571-2507. Thank you,. Dustin Hollan Estimator ,,,,MasTec North America, Inc. 4747 Irving Blvd. Suite 221 Dallas Texas 75247 214.571.2500 fax 214.571.2555 www.m~tstec.oom