Loading...
SW0001-CS040526 T H E C I T Y 0 F COpPELL May 26, 2004 Mr. Bradley J. Moss Pacheco Koch Consulting Engineers 8350 North Central Expressway, Suite 1000 Dallas, Texas 75206 Riverchase Elevated Sidewalk SW 00-01 Record Drawings Dear Mr. Moss: A 2" x 6" handrail was built on top of the cedar post caps in accordance with the detail that Pacheco Koch sent to the City on July 16, 2003. The addition of the handrail was the only change made to the construction plans. Please prepare the record drawing for the above referenced project. Should you have any questions or need any additional information, please contact Suzan Taylor at 972-304-7019. Sincerely, '., · ~Gaffe-th CampbeiT \ Construction Inspector Engineering Department 972-304-3685