Loading...
WA0101-CS040527 (2)BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 JOH~ W. BIRKHOFF, P.E. RONALD V. CONWAY, P.E. GARY C. HENDRICKS, P.E. JOE R. CARTER, P.E. PAUL A. CARLlixrE, P.E. MATT HICKEY, P.E. DOUGLAS K. SHOWERS, P.E. Dallas, Texas 75231 Fax (214) 361-0204 May27,2004 Phone (214) 361-7900 Ms. SuzanC. Taylor, C.I.P. Coordinator City of Coppell Post Office Box 478 Coppell, Texas 75019 State Highway 121 Water Line (Coppell Road to Denton Tap Road) Project No. WA 01 - 01 Permanent and Temporary Easements Dear Ms. Taylor: Please find enclosing two sets each of the signed plat and field note description for the permanent water line easement and documents for the temporary construction easement required for construction of the State Highway 121 Water Line (Coppell Road to Denton Tap Road). The easements included cross the following property: SCI Denton Tap Ltd., P.S. Volume 99106, Page 7729 (LR of DC) We are available to discuss this project further at your convenience. Enclosures Sincerely your/~ //. / ~'Douglas .~howers, P.E..