WA0101-CS040527 (2)BIRKHOFF, HENDRICKS & CONWAY, L.L.P.
CONSULTING ENGINEERS
7502 Greenville Ave., #220
JOH~ W. BIRKHOFF, P.E.
RONALD V. CONWAY, P.E.
GARY C. HENDRICKS, P.E.
JOE R. CARTER, P.E.
PAUL A. CARLlixrE, P.E.
MATT HICKEY, P.E.
DOUGLAS K. SHOWERS, P.E.
Dallas, Texas 75231
Fax (214) 361-0204
May27,2004
Phone (214) 361-7900
Ms. SuzanC. Taylor, C.I.P. Coordinator
City of Coppell
Post Office Box 478
Coppell, Texas 75019
State Highway 121 Water Line (Coppell Road to Denton Tap Road)
Project No. WA 01 - 01
Permanent and Temporary Easements
Dear Ms. Taylor:
Please find enclosing two sets each of the signed plat and field note description for the permanent water line
easement and documents for the temporary construction easement required for construction of the State
Highway 121 Water Line (Coppell Road to Denton Tap Road). The easements included cross the following
property:
SCI Denton Tap Ltd., P.S.
Volume 99106, Page 7729 (LR of DC)
We are available to discuss this project further at your convenience.
Enclosures
Sincerely your/~ //. /
~'Douglas .~howers, P.E..