Loading...
ST0202-CS040528COPPELL May 28, 2004 David Dendy Tiseo Paving, Inc. PO Box 270040 Dallas TX 75227 fax 972/216-5637 RE: Bethel School Road Reconstruction ST 02-02 Final Walk-thru Dear Mr. Dendy: Please be advised that a walk-thru inspection has been scheduled for Wednesday, June 2~ at 10:00 a.m. for the paving, utility and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3685 at your earliest convenience. Sincerely, Garreth D. Campbell, Sr. Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 CCl Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Keith Marvin, P.E., Civil Engineer Rhonda Brothers, Engineering Secretary Tim Oates, Fire Marshal 255 PARKWAY ~ P.O.BOX 9478 i COPPEkl TX 75019 i tel 972/462 0022 ~ FAX 972/304 3673