ST9601-CS 980501/~--'~ The City With A Beautiful Future
PO, BOX 478
COPPELL, TEXAS 75019
RO. Box 478
Coppell, Texas 75019
972-462-0022
May 1, 1998
Stephen L. Bryan, Director of Development
Catellns Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
RE: Wrangler Drive Project ST 96-01
Dear Mr. Bryan:
On April 28, 1998 the City of Coppell opened bids for thc construction of Wrangler Drive. The
bids received by the City of Coppell totaled $377,784.20 for the portion of Wrangler adjacent to
the Catellns and PUc Trust property. The Engineering's estimate for the project was
$380,646.00. On November 5, 1997, I provided information to you concerning the estimated
cost of the project and calculations where approximately 59% of the cost would be paid by
Catellus. On February 26, 1998 you acknowledged that Catellns was willing to participate in the
cost sharing as previously provided. Therefore, the participation by Catellns will be in the
amount of $222,892.68 (377,784.20 x 59%). The associated water improvements along this
section total $40,673.40. As previously indicated the entire cost for the water line improvements
is being paid by the City of Coppell.
It is the City's intention to award this project at the May 12, 1998 City Council meeting.
Arrangements should be made as soon as possible to provide the City of Coppell the appropriate
funding in the amount of $222,892.68 so that the entire project can be awarded and constructed
as designed.
If you should have any questions please feel free to contact me at (972)304-3679.
Sincerely, tO.
Kenneth M. GrllTm, P.E.
Director of Engineering and Public Works
The City With A Beautiful Future
PO. BOX 478
COPPELL, TEXAS 75019
PO. Box 478
Coppell, Texas 75019
972-462-0022
May 1, 1998
F. Michael Nugent, Asset Manager
Pac Trust
Pacific Reality Associates L.P.
15350 S.W. Sequoia Parkway, Suite 300
Portland, OR 97224
RE: Wrangler Drive Project ST 96-01
Dear Mr. Nugent:
On April 28, 1998 the City of Coppell opened bids for the construction of Wrangler Drive. The
bids received by the City of Coppell totaled $377,784.20 for the portion of Wrangler adjacent to
the Pac Trust and Catellns property. The Engineering's estimate for the project was
$380,646.00. On November 5, 1997, I provided information to you concerning the estimated
cost of the project and calculations where approximately 41% of the cost would be paid by Pac
Trust. On March 6, 1998 you acknowledged that Pac Trust was willing to participate in the cost
sharing as previously provided. Therefore, the participation by Pac Trust will be in the amount
of $154,891.52 (377,784.20 x 41%). The associated water improvements along this section total
$40,673.40. As previously indicated the entire cost for the water line improvements is being
paid by the City of Coppell.
It is the City's intention to award this project at the May 12, 1998 City Council meeting.
Arrangements should be made as soon as possible to provide the City of Coppell the appropriate
funding in the amount of $154,891.52 so that the entire project can be awarded and consu cted
as designed.
If you should have any questions please feel free to contact me at (97~
Kenneth M. 6riffin, P.E.
Director of Engineering and Public Works