Loading...
SS9901-CS040301 SUMMARY OF BIDS FORCE MAIN LINES AAND B DEFOREST ROAD LIFT STATION IMPROVEMENTS CITY OF COPPELL Bidder Bid Amount Altemative I - HDPE by Directional Drilling Hall Albert $1,487,892 Mastec $1,569,170 Barson $1,727,111 Insituform $1,920,702 Average $1,676,219 Minimum $1,487,892 Maximum $1,920,702 Median $1,648,141 Eng. Est. - Oct 03 Eng. Est. - Jan 04 $1,601,380 $1,381,800 Alternative II - Ductile Iron by Open Cut Atkins Bros. $1,157,799 SJ Lewis $1,177,506 Bar $1,507,376 Barson $1,974,722 Average $1,454,351 Minimum $1,157,799 Maximum $1,974,722 Me_.~en $1,342,441 Eng. Est. - Oct 03 Eng. Est. - Jan 04 $1,433,053 $1,018,500 Contract Duration No. Pits -A No. Pits - B 210 days 6 2 250 days 10 3 120 days 7 2 270 days 8 2 Hall Albert Insituform 150 days Bid R~ected 200 days 240 days 180 days Atkins Bros. Barson Turner Collie ._ Braden Inc.. ENGINEERS.PLANNERS.PROJECT MANAGERS 17300 Dallas Parkway Suite 1010 Dallas, Texas 75248 972-735-3000 Fax 972-735-3001 TRANSMITTAL To: Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Date: March 1, 2004 Re: DeForest Road Lif~ Station Improvements Fome Main Lines A & B and Fome Main LineD Job No.: 052131124.0001 Transmitted By: Courier We are sending you the following: Copies 1 1 1 1 1 1 Description Force Main Lines A & B Bid Summary Force Main Line D Bid Summary Hall Albert Bid Qualifications (Lines A&B - HDPE) S.J. Lewis Bid Qualifications (Line A&B - DI) Mastec Bid Qualifications (Line D - HDPE) Atkins Brothers Bid Qualifications (Line D - DI) Remarks: Please find enclosed the above referenced information. I have included the bid summaries for the project and the qualification information received from each of the four low bidders. We are currently verifying the information and checking references. Copies To: File Ted B. Sugg, Project Manager