Loading...
SS9901-CS040301 SUMMARY OF BIDS FORCE MAIN LINE D DEFOREST ROAD LIFT STATION IMPROVEMENTS CITY OF COPPELL Bidder Bid Amount Alternative I - HDPE by Directional Drilling Mastec $2,341,671 John Bums $2,951,760 Insituform $2,985,070 Barson $3,188,105 Hall Albert $3,193,570 Average $2,932,035 Minimum $2,341,671 Maximum $3,193,570 Median $2,985,070 Contract Duration No. Pits 300 days 11 180 days 8 300 days 10 150 days 9 270 da~s 10 Mastec Hall Albert '14 small pits Eng. Est. - Oct 03 Eng. Est. - Jan 04 $2,798,540 $2,337,200 Alternative II - Ductile Iron by Open Cut Atkins B~os. $2,593,996 180 days Jackson $2,612,520 250 days 8J Lewis $2,661,044 300 days Bar $2,851,168 300 days John Bums $2,927,563 180 days Barsen $3,336,913 210 da~s Average $2,830,534 Minimum $2,593,996 Maximum $3,336,913 Med~ $2,756,106 Atkins Bros. Barson Eng. Est. - Oct 03 $2,836,240 Eng. Est. - Jan 04 $2,225,200 'lia r Collie ._ n Inc. ENGI~EERSopLANNERS.PROJECT MANAGERS 17300 Dallas Parkway Suite 1010 Dallaz, Texas 75248 972-735-3000 Fax 972-735-3001 TRANSMITTAL To: Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Date: March 1, 2004 Re: DeForest Road Lffi Station Improvements Force Main Lines A & B and Force Main Lined Job No.: 052131124.0001 Transmitted By: Courier We are sending you the following: Copies 1 1 1 1 1 1 Description Force Main Lines A & B Bid Summary Force Main Line D Bid Summary Hall Albert Bid Qualifications (Lines A&B - HDPE) S.J. Lewis Bid Qualifications (Line A&B - DI) Mastec Bid Qualifications (Line D - HDPE) Atkins Brothers Bid Qualifications (Line D - DI) Remark: Please find enclosed the above referenced information. I have included the bid summaries for the project and the qualification information ~ceived from each of the four low bidders. We are currently verifying the information and checking references. Copies To: File Ted Project Manager