SS9901-CS040603DEFOREST RD. LIFT STATION IMPROVEMENTS, FORCE MAIN LINES A &B
Coppell, Texas
Owner: City of Coppell, Texas
Contractor: S J Louis Construction of Texas, Ltd., LLP
Engineer: Turner, Collie & Braden, Inc
CONSTRUCTION SCHEDULE
ACTIVITY UNIT QTY, START FINISH Ma, -04 Jun-04 Jul-04 AU, 1-04 :~ tO4
I 2 3 4 I 2 3 4 I 2 3 4 1 2 3 4 1 2 3 4
~4OBILIZATION 7-Jun 14-Jun XX)O( X.XXX
!4" SDR 26 PVC GRAVITY MAIN BY
~ORE WI 36" STEEL ENCASEMENT LF 1500 3-Jun X
(0+45 - 0+60)
24" SDR 26 PVC GRAVITY MAIN 6Y
BOREWI36"STEELENCASEMENT LF 8000 11 Jun XX.XX X
(0+69- 1+49)
20" DUCTILE IRON FORCE MAIN BY
BORE W/30'STEEL ENCASEMENT LF 105.00 14-Jun 18-Jun X)O(X
(3+48 - 4*53)
.~[~.,~E~ LF 450 O0 14-Jun 25-Jun I X
20" DUCTILE IRON FORCE MAIN BY
6ORE W/30"STEEL ENCASEMENT LF 99.00 21-Jun 25-Jun XXXXX
(12+80 - 13+79)
+59.4) ,
0" D.I FORCE MAIN (1+59;4-
0" D.I. FORCE MAIN (11~50 -
3" D.I. FORCE MAIN (26+00 -
ACTIVITY ILl"rtl O". I 6.~ I ""~" I ',~ I ~..m I Jul-04 I Aug-04 I Sep-04
t1+08) HYDROMULCH LF 543.00 lO*Jul 25*Jul
, X Y. XP(XX
~ D.I FCiR~E MAIN (4~+08 -
~?~45+11-4~+11), LF 10000 26-Jul 26-Ju~ X
20' D.). ru~[;Ic MAJN (46+11 -
~N (1 '20- 9+0--~,
HYDROMUI~CH (INC, L~DE~ TYro
10" DUCTILE IRON FORCE MAIN BY
BORE W/42" STEEL ENCASEMENT
(5+36 - 6+06)
MlSC, ITEMS
X X
CONCRETE MANHOLE
CONCRETE MH ON EXISTING TRA
GRAVITY MAIN
HYDROSTATIC PIPE
LINE
HYDROSTATIC PIPE TESTING OF
TEST - LATE AUGUST)
FINAL TEST ALL CONNECTIONS IMMEDIATELY AFTER COMPLETION (ANTICIPATED TEST - EARLY SEPTEMBER)
NOTES: