Loading...
SS9901-CS040603DEFOREST RD. LIFT STATION IMPROVEMENTS, FORCE MAIN LINES A &B Coppell, Texas Owner: City of Coppell, Texas Contractor: S J Louis Construction of Texas, Ltd., LLP Engineer: Turner, Collie & Braden, Inc CONSTRUCTION SCHEDULE ACTIVITY UNIT QTY, START FINISH Ma, -04 Jun-04 Jul-04 AU, 1-04 :~ tO4 I 2 3 4 I 2 3 4 I 2 3 4 1 2 3 4 1 2 3 4 ~4OBILIZATION 7-Jun 14-Jun XX)O( X.XXX !4" SDR 26 PVC GRAVITY MAIN BY ~ORE WI 36" STEEL ENCASEMENT LF 1500 3-Jun X (0+45 - 0+60) 24" SDR 26 PVC GRAVITY MAIN 6Y BOREWI36"STEELENCASEMENT LF 8000 11 Jun XX.XX X (0+69- 1+49) 20" DUCTILE IRON FORCE MAIN BY BORE W/30'STEEL ENCASEMENT LF 105.00 14-Jun 18-Jun X)O(X (3+48 - 4*53) .~[~.,~E~ LF 450 O0 14-Jun 25-Jun I X 20" DUCTILE IRON FORCE MAIN BY 6ORE W/30"STEEL ENCASEMENT LF 99.00 21-Jun 25-Jun XXXXX (12+80 - 13+79) +59.4) , 0" D.I FORCE MAIN (1+59;4- 0" D.I. FORCE MAIN (11~50 - 3" D.I. FORCE MAIN (26+00 - ACTIVITY ILl"rtl O". I 6.~ I ""~" I ',~ I ~..m I Jul-04 I Aug-04 I Sep-04 t1+08) HYDROMULCH LF 543.00 lO*Jul 25*Jul , X Y. XP(XX ~ D.I FCiR~E MAIN (4~+08 - ~?~45+11-4~+11), LF 10000 26-Jul 26-Ju~ X 20' D.). ru~[;Ic MAJN (46+11 - ~N (1 '20- 9+0--~, HYDROMUI~CH (INC, L~DE~ TYro 10" DUCTILE IRON FORCE MAIN BY BORE W/42" STEEL ENCASEMENT (5+36 - 6+06) MlSC, ITEMS X X CONCRETE MANHOLE CONCRETE MH ON EXISTING TRA GRAVITY MAIN HYDROSTATIC PIPE LINE HYDROSTATIC PIPE TESTING OF TEST - LATE AUGUST) FINAL TEST ALL CONNECTIONS IMMEDIATELY AFTER COMPLETION (ANTICIPATED TEST - EARLY SEPTEMBER) NOTES: