SS9901-CS040603 DRAFT T H E C: I T Y · O Fr COPP-Ei £ Deforest Road Lift Station Improvements Force Main Line 'D' / SS 99-01 Preconstruction Conference Agenda Jtme 3, 2004 ~ 9:00 a.m. Utilities · Franchised Utilities · Dallas Water Utilities 30" water line 2. City of Coppell Guidelines a) Safety Traffic Control - Warning Devices - Lighted Barricades b) Working hours Inspection hours are from 8:00 a.m. to 5:00 p.m. For work on Saturday - request must be made by 12:00 a.m. on Wednesday and called-off by 3:00 p.m. on Friday. No work without written approval notice. c) Contractor responsible for all construction staking as per the plans. d) Testing City will choose the testing laboratory contractor will pay for any retesting. e) Contractor responsible for locating and protecting all utilities. Must pay for, or repair ail damaged utilities in a timely manner. Contractor responsible for any damage to landscaping due to a damaged irrigation system. f) Contractor needs to dispose of all waste before it becomes a problem. g) Traffic Control - work hours are from 9:00 a.m. to 4:00 p.m. Only one lane of traffic can be closed at any time. No lanes closed before 9:00 a.m. or after 4:00 p.m. Intersection and turnaround closures. h) Changes to plans or specifications must come through our office first. i) Sanitary facilities on site. j) Keep set of Construction Standards on site. k) Superintendent on site at all times. I) Construction trailer on site at all times. m) Project signs DRAFT 3. Submittals a) Responsible persons (2) - Names and 24 hour telephone numbers b) List of subcontractors with contact person and phone number c) Construction sequencing schedule d) Monthly estimate form e) Traffic Control Plan f) Trench Safety Plan g) Materials Ductile iron force main and fittings concrete batch design - for each mix air relief valves 4. Construction Methods 1. Trench Embedment ,, Type B-2 & C - V4" crushed stone to ~ up outside diameter of pipe - 1' sand over pipe · Type C - when used in streets 95 - 100% compaction, +5 percentage points above optimum moisture. Cement stabilized sand from top of embedment to bottom of concrete, 1 foot behind back of curb. 2. No water jetting allowed. Expansion Joints · Full depth redwood boards extended through curbs · At ends of each radius or as per plans and specifications Paving · # 3 rebar at 18" o.c. · 3600 - 6 sack concrete - no fly ash batch design · #6 smooth dowels x 24" long at 24" o.c. · All concrete to be plated prior to releasing traffic. Contractor at his expense may have cylinders cast early (3 days) otherwise plating (1" thick x 1' overlap of patch) shall remain for 7 days assuming cylinder is okay. 5. All disturbed areas of median and parkway to be resodded with common Bermuda grass sod and kept watered until established. 6. All barricades left behind curb overnight to have lights. 6. Final Walk- Through 7. Punch List 8. Record Drawings 9. Acceptance Deforest Road Lift Station Im_p_.~ovements Force Main Line 'D' [~S _S-99-~1~ PreconsWuction Conference Agenda June 3, 2004 ~ 9:00 a.m. Utilities · Franchised Utilities · Dallas Water Utilities 30" water line City of Coppell Guidelines a) Safety - Traffic Control - Warning Devices Lighted Barricades 4o~z,xbj,~_~ t.~_,~ q ;~ b) Working hours Inspection hours are from 8:00 a.m. to 5:00 p.m. For work on Saturday request must be made by 12:00 a.m. on Wednesday and called-off by 3:00 p.m. on Friday. No work without written approval notice. c) Contractor responsible for all construction staking as per thc plans. d) Testing City will choose the testing laboratory - contractor will pay for any retesting. ~>t r ~ ~'4, r- I o D e) Contractor responsible for locating and protecting all utilities. Must pay for, or repair all damaged utilities in a timely manner. Contractor responsible for any damage to landscaping due to a damaged irrigation system. % ~'~ ' '3 C .~ ¢. 4; ~ f) Contractor needs to dispose of all waste before it becomes a problem. g) Traffic Control xvork hours are from 9:00 a.m. to 4:00 p.m. Only one lane of traffic can be closed at any time. No lanes closed before 9:00 a.m. or after 4:00 p.m. Intersection and turnaround closures. h) Changes to plans or specifications must come through our office first. i) Sanitary facilities on site. j) Keep set of Constructmn Standards on s~te. k) Superintendent on site at all times. 1) Construction trailer on site at all times. m) Project signs 7. 8. 9. Submittals a) Responsible persons (2) - Names and 24 hour telephone numbers b) List of subcontractors with contact person and phone number c) Construction sequencing schedule d) Monthly estimate form e) Traffic Control Plan f) Trench Safety Plan g) Materials Ductile iron force main and fittings concrete batch design - for each mix air relief valves 4. Construction Methods Trench Embedment · Type B-2 & C - ~" crashed stone to ~/4 up outside diameter of pipe - 1' sand over pipe Type C - when used in streets 95 - 100% compaction, +5 percentage points above optimum moisture. Cement stabilized sand from top of embedment to bottom of concrete, I foot behind back of curb. 2. No water jetting allowed. Expansion Joints · Full depth redwood boards extended through curbs · At ends of each radius or as per plans and specifications Paving · # 3 rebar at 18" o.c. · 3600 - 6 sack concrete - no fly ash - batch design · #6 smooth dowels x 24" long at 24" o.c. · All concrete to be plated prior to releasing traffic. Contractor at his expense may have cylinders cast early (3 days) otherwise plating (1" thick x 1' overlap of patch) shall remain for 7 days assuming cylinder is okay. 5. All disturbed areas of median and parkway to be resodded with common Bermuda grass sod and kept watered until established. 6. All barricades left behind curb overnight to have lights. Final Walk - Through Punch List Record Drawings Acceptance 2