ST0202-CS040602June 2, 2004
David Dendy
Tiseo Paving, Inc.
PO Box 270040
Dallas TX 75227
CO-PPE £
fax 972/216-5637
RE: Bethel School Road Reconstruction ST 02-02
Final Walk-thru - RESCHEDULED
Dear Mr. Dendy:
Please be advised that the walk-thru inspection has been re-scheduled for Thursday, June 3~ at
10:00 a.m. for the paving, utility and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that conlractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-3685 at your earliest convenience.
Sincerely,
C~D/. Campbell, Sr.
Comtruction Inspector
Off-~ Phone: (972) 304-3685
Fax: (972) 304-3570
Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hoilowell, P.E., Asst. Director of Public Works
Keith Marvin, P.E., Civil Engineer
Rhonda Brothers, Engineering Secretary
Tim Oates, Fire Marshal