Loading...
ST0202-CS040602June 2, 2004 David Dendy Tiseo Paving, Inc. PO Box 270040 Dallas TX 75227 CO-PPE £ fax 972/216-5637 RE: Bethel School Road Reconstruction ST 02-02 Final Walk-thru - RESCHEDULED Dear Mr. Dendy: Please be advised that the walk-thru inspection has been re-scheduled for Thursday, June 3~ at 10:00 a.m. for the paving, utility and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that conlractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3685 at your earliest convenience. Sincerely, C~D/. Campbell, Sr. Comtruction Inspector Off-~ Phone: (972) 304-3685 Fax: (972) 304-3570 Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hoilowell, P.E., Asst. Director of Public Works Keith Marvin, P.E., Civil Engineer Rhonda Brothers, Engineering Secretary Tim Oates, Fire Marshal