Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Brighton Manor-LR040604
Texas CM% In,c, Construction Materials Testing ~;~ and Environmental Consultin~g ~ 10044 Monroe Drive ' Dallas, Texas 75229 ~957 Fax (214) 352-6972 REPORT OF CONCRETE 1VEI, K OBSERVATION Report Date: Client: Project: Concrete Supplier and Plant: Location of Placement: June 4, 2004 Street Custom Homes Brighton Manor ~ G uzrnan Construction LMC #3 Inlets/Manhole Date Concrete Placed: May 7, 2004 Standard 6"x12" A~ea 28.27 Square Inches Concrete Report No.: 4 Project No.: 204-0126 MATERIALS s~ sso s.,~ w,, OBSERVATION DATA Mix Number: 1703 Time Sample Batched: Cement: A~I~ ~, Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 84°F Fine Aggregate: Concrete Range: 85°F Slump Range (inches): 3" Admixtures: Weather Conditions: Clear I Time Started: 01:00 pm 2 Time Completed: 06:00 pm Added Water: 5 gallons Sample Air Content (%): 36% Total Cubic Yards Placed: 45 02:31 pm 03:30 pm Manhole - Samuel & MacArthur intersection 964/307730 in.): 4.000 BM 13 7 05/14/04 100,580 3,~--~--~'~ BM 14 3" 28 06/04/04 132,560 BM 15 28 06/04/04 120,060 BM 16 H HOLD Test Methods Utilize~ Fracture Re~imlar Cylinders Made By: KN Remarks and/or Distribution: cc: Mr Jim Street- Street Custom Homes Mr Larry Davis - City of Coppell Mr Rodney Louviere - Fax: 972-931-6787 Reviewed by: