Loading...
ST9801-CS000113 (2)FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS. TEXAS 75354-0787 DALLAS. TEXAS 75220 January 13, 2000 Mr. Kevin C. Young, E.I.T. Freese and Nichols, Inc. 1701 N. Market, Suite 500, LB 51 Dallas, Texas 75201 Coppell Road Reconstruction SH 121 to Sandy Lake Road Dear Mr. Young: In accordance with your request for a revised cost break dom regarding the additional cost required to construct the mulfple box culvert in two stages, the following information is provided for your review: Stage 1 Dirtwork for one lane detour Culvert for detour HMAC for detour surface (161 TNS) Remove detour Striping for detours Extra handling of dirt (2600 CY) $10,000.00 $1,000.00 $12,700.00 $5,000.00 $1,000.00 $25,000.00 Stage 2 Dirtwork for demur Provide and set CTB w/end protection (300 LF) Remove CTB w/end protection HMAC for detour surface (108 TNS) Remove detour Striping fqr detours Labor/Equipment increase for decreased production $6,000.00 $10,800.00 $3,500.00 $8,400.00 $3,000.00 $I,000.00 $52~000.00 Total $139,400.00 If you have any questions regarding this information, don't hesitate to contact our 6ffice. crely,  tru3~nC°mpany · Were; Project Engineer xc: Mr. Kent Collins, P.E., Engineering and Public Works, City of Coppell 255 Parkway Blvd., Coppell, Texas 75019-4409 AN EQUAL OPPORTUNITY EMPLOYER