Loading...
ST9902-CS040527TEAGUE NALL AND PERKINS ENGINEERS · SURVEYORS · CONSULTANTS May 27, 2004 Mr. Ken Griffin, P.E. Director of Engineering & Public Works 255 Parkway P.O. Box 478 Coppell TX 75019 Re: Sandy Lake Road Reconstruction Dear Mr. Griffin: Pumuant to your request we have evaluated the potential impacts that construction of the West Sandy Lake Road project might have on an existing stone retaining wall located approximately on the right-of-way line between stations 55+00 +/- and 59+00 +/-. The vertical alignment of the proposed roadway in this area will result in the pavement being placed very near or below the elevation of existing ground at the outside curb line which is located approximately 20 feet from the wall. We have determined that this project can be constructed to the proposed horizontal and vertical alignments in a manner without increasing the pressure on this wall. We will incorporate into the final design the required elements, as necessary, to prevent the roadway improvements from imposing additional loading on this structure. Please contact us if you have any questions or need additional information concerning this item. Sincerely, TEAGUE NALL AND PERKINS, INC. Delvin Black, P.E. 235 West Hickory Street, Suite 100 · Denton, Texas 76201 · 940.383:4177 phone ° 940.383.8026 fax www. trip-online.corn