Loading...
SS9901-CS040617T H E (~ I T Y O F P.O. Box 9478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX COVER SHEET To: George Cisneros From: Rick O'Dell, Project Inspector Fax: 972-735-3001 Date: June 17, 2004 Project No: SS 99-01 Lines 'A&B' Pages: 2 (including cover sheet) RFI - Downsizing of Bored Re: Steel Casing Diameter cc: [] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested -Comments: The City does not agree with their one-third share ($4,473.33) of the total savings on the downsizing of the 36-and 48-inch diameter bored steel casings. The City wants their share to be one-half of the total savings ($6710.00) or the diameters of the bored steel casings can remain at 36-and 48-inches. We need an answer from S.J. Louis as soon as possible since they want to start boring today. Your consideration of this matter is appreciated. Rick O'Dell 972-304-7090 IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering- Excellence By Design" Request For Information (Riel) Coppe!l Deforest Road Lif Station Improvements Force Main Lines A & B Mr /edd B. Sugg, PE. Turner Collie & Braden Inc. 17300 Dallas Parkway, Suite I010 Dallas, Texas 752a8 Fax: (972) 735-3001 1 / 04/21/On David A. Dickerson, ?E., M.B.A. Estimator/Sf~etary-Treasurer ' 0 a S.J. Louis Construction of Texas proposes one "no cost" change alternative on the above referenced proj'ect: · Conversion of three locations to horizontal directional drilling (HDD). In order to minimize traffic ~md surface disruption and increase the speed at which the project can be completed, ova' company requests three deep excavation areas be converted to HDD using HDPE (per project specifications): 1) STA 7'-,-00 to STA 11+50 (450 LF), 2) STA 21+20 ',o STA 26+00 (480LF), a~d 3) STA 32+00 to STA 35+50 (250 LF). Again, this would be a "no cost" change, as S.J Louis Construction would have to compensate the driller for some areas which would previously had been installed by open cut methods, amd open cut instalIation at shallow depth is much less expensive than HDD methods. Payment would be made tiu-ough pay estimate as if ductile iron pipe materials and casing had been installed without any changes. S.I. Louis Construction of'Texas proposes one "credit to Owner" change alternative: · Downsi~ing of bored steel casing diameter. In order to reduce spoil material production and potentially use smaller bonng equipment, which would reduce traffic and surface disruption and increase the speed at which the project can be completed, our company requests 330 L F of 36" diameter steel casing be downsized to 30" in diameter for the 20" DIP (95 LF of 36" diameter casing for 24" gravity SS PVC remains unchanged), and 88 LF of 48" diameter steel casing be downsized to 42" in diameter for the 30" DIP. The 30" dian~eter steel casing would still allow 4.7" of clear space from edge of pipe bell to inside wall of casing, while the 42" diameter steel casing would still allow 6.0" of clear space from edge of pipe bell to inside wall of casing. S.J. Louis Construction of Texas assumes all responsibilky for ensuring that the pipe can be installed adequately inside the casing, and is completely confident there will be no problems. Credit to Owner: Total savings of 330 LF x S30 00/LF and 88 LF x $40.00/LF equals $ l 3,420.00, to be split in thirds for value engineering with Owner receiving $4,473.33 credit, subcontractor retaining $4,473.33 savings, and S.J. Louis receiving 54,473.33 savings. Authorized Signature [.es X,'. Whltwna~.~, S J. Louis Cons~ction of Texas Ltd., LLP File 140[6 S..L Louis Construction of I-~.'xas Ltd. P.O. Box 834 Mansfield, lZ-xas 76063 47%0320 Office ($I7) 477-0552 Iro. r.