John, Just a quick update on the progress for Sandy Lake Road Landscaping. We have now received
enough base information from Kimley Horn and Eddie to begin design concepts. We anticipate to review
design options with you by the end of the month. However, we still need more site / base information if we
are to take any concepts to a construction document format. The remaining items needed are as follows:
1. All irrigation taps and sleeves from Macarthur to Denton Tap. 2. Existing locations of light pole
fixtures 3. Actual field locations of existing sidewalks. Weneedtogettheaboveitemsbytheendofthe
month if we are to keep track with a reasonable schedule. Let me know if we can achieve this milestone
by the end of the month. Thanks, Thomas W. Woliver, ASIA
Senior Associate
TBG Partners
302 North Market St,
Suite 450
Dallas, Tx 75202
214.744.0757 ph
214.744.6785 fx