Loading...
Four Seasons 2R-CS040617CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Four Seasons Addition~ Lot 2R (BCE Specialties~ Inc.h Replat P & Z HEARING DATE: C.C. HEARING DATE: June 17, 2004 (Continued from the Commission's May 20, 2004, meeting.) July 6, 2004 STAFF REP.: Matt Steer, City Planner LOCATION: Southeast comer of Sandy Lake Road and Royal Lane. SIZE OF AREA: 4.1 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Replat approval to alloxv the construction of an approximate 56,750-square-foot office/warehouse. APPLICANT: Page 1 of 4 Owner Beth Cunningham 2860 Market Loop Southlake, TX 76092 Phone: (817) 949-2030 Fax: (817) 488-9158 Architect Hardy McCullah/MLM Architects, Inc. Kyle McCullah 12221 Merit Drive, Suite 280 Dallas, TX 7525 l Phone: (972) 385-1900 Fax: (972) 385-1937 Engineer Pacheco Koch Consulting Engineers C. Jack Evans 8350 N Central Expressway, Suite 1000 Dallas, TX 75206 Phone: (972) 235-3031 }:ax: (972) 235-9544 Item # 5 HISTORY: TRANSPORTATION: In 1990, a Final Plat and Site Plan were approved for a 13.7-acre tract of property. The original plans included the construction of a 152,000-square-foot building (existing) and a proposed Phase 2 expansion to include a 138,000-square-foot building on the property adjacent to Sandy Lake Road, which was never constructed. In 1999, City Council approved a replat for the northern 4.1 acres to make this tract a separate lot. This approval was subject to a condition that any modification to the existing building would require a site plan review and a replat. The Planning and Zoning Commission denied the replat for this property on May 20, 2004, due to changes that needed to be made to the north and west elevations of the Site Plan package. Both Royal Lane and Sandy Lake Road are projected to be C4D/6, four-lane divided thoroughfares in a six-lane divided right-of-way. SURROUNDING LAND USE & ZON1NG: North- Vacant, LI (Light Industrial) South - Stone Panels, Inc., LI (Light Industrial) East - AmberPoint Business Park, LI (Light Industrial) West - Vacant, LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom. DISCUSSION: This is a 4.1-acre replat of the Four Seasons Addition, Lot 2. A 56,750- square-foot office/warehouse is proposed. BCE Specialties, Inc., an elevator finishing company, will be the primary tenant and occupy 22,555- square feet. The business does the interior finish-out of elevators, then ships them to their final destination. The remaining six lease spaces will range from 5,000- to 7,445-square feet, and the tenants are currently unknown. There are three proposed ingress/egress points (two from Sandy Lake and one from Royal). The access point along Royal is shown at the south end of the property, but will have to be relocated due to drainage concerns regarding the location of a storm water inlet. The fire lane easement encircles the building and is accessible off two of the three ingress/egress Page 2 of 4 Item # 5 points. The location of the fire lane easement will be need to be revised to reflect the access point relocation along Royal. It will be reevaluated by the Fire Marshal to ensure conformance with the City of Coppell standards. The access point along Royal will not need to be relocated provided the Engineering Department approves a modified drainage plan. There is a 24' access easement depicted on the northeast comer of the property. This will need to be extended to connect with the fire lane and be renamed a fire lane and access easement. There is a 24' fire lane and access easement shown connected by an access easement to the east. There are other minor technical details outlined in the plat conditions. After those are met, the subdivision will meet the Subdivision Ordinance requirements. The technical details outlined in the plat conditions were met. RECOMMENDATION TO THE PLANN1NG AND ZONING COMMISSION: Staff recommends APPROVAL of the Replat, subject to the following conditions being met: 2003. 7) Compliance with the attached Engineering comments. ALTERNATIVES 1) Page 3 of 4 Recommend approval of the request Item # 5 2) Recommend disapproval of the request 3) Recormnend modification of the request ATTACHMENTS: 1) Final plat 2) Engineering Conunents Page 4 of 4 Item # 5 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Four Seasons Addition~ Lot 2R (BCE Specialties~ Inc.h Site Plan P & Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: June 17, 2004 (Continued from the Commission's May 20, 2004, meeting.) July 6, 2004 Matt Steer, City Planner LOCATION: Southeast corner of Sandy Lake Road and Royal Lane. SIZE OF Al:LEA: 4.1 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Site Plan approval to allow the construction of an approximate 56,750-square-foot office/warehouse. APPLICANT: Page l of 5 Owner Beth Cunningham 2860 Market Loop Southlake, TX 76092 Phone: (817) 949-2030 Fax: (817) 488-9158 Architect Hardy McCullah/MLM Architects, Inc. Kyle McCullah 12221 Merit Drive, Suite 280 Dallas, TX 75251 Phone: (972) 385-1900 Fax: (972) 385-1937 Engineer Pacheco Koch Consulting Engineers C. Jack Evans 8350 N Central Expressway, Suite 1000 Dallas, TX 75206 Phone: (972) 235-3031 Fax: (972) 235-9544 Item # 4 HISTORY: In 1990, a Final Plat and Site Plan were approved for a 13.7-acre tract of property. The original plans included the construction of a 152,000-square-foot building (existing) and a proposed Phase 2 expansion to include a 138,000-square-foot building on the property adjacent to Sandy Lake Road, which was never constructed. In 1999, City Council approved a replat for the northern 4.1 acres to make this tract a separate lot. This approval was subject to a condition that any modification to the existing building would require a site plan review and a replat. The Planning Commission reviewed a Site Plan package on May 20, 2004, and continued the case to June 17, 2004, in order for the applicant to provide revised north and west elevations. TRANSPORTATION: Both Royal Lane and Sandy Lake Road are projected to be C4D/6, four-lane divided thoroughfares in a six-lane divided right-of-way. SURROUNDING LAND USE & ZONING: North- Vacant: LI (Light Industrial) South - Stone Panels, Inc., LI (Light Industrial) East - AmberPoint Business Park, L1 (Light Industrial) West - Vacant: LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom. DISCUSSION: A 56,750-square-foot office warehouse with seven lease spaces is proposed to be erected on this 4.1-acre site. The primary tenant will be BCE Specialties, Inc., an elevator finish-out company (occupying 22,555- square feet). The remaining six lease spaces will range from 5,000- to 7,445-square feet. The tenants are unknown at this time. There are three 9'x10' sheltered dock high doors (four feet above ground level) located on the southeast corner of the proposed warehouse to support BCE Specialties, Inc. Each of the smaller lease spaces will have one 10'xl0' grade-level overhead door. These are designed for smaller trucks. All loading will be screened with a 10' wall on the east and west Page 2 of 5 Item # 4 and with landscaping (45 Eastern Red Cedars and 18 Cedar Elms) along the south property line. The access point and median opening along Sandy Lake are being coordinated with the developers to the north. The access point along Royal is shown at the south end of the property but will have to be relocated due to drainage concerns regarding the location of a storm water inlet. The parking space requirement is calculated with the inclusion of 27,600-square-feet of office space. The building lotal usage will be limited to 49% office space with the remainder to be warehousing. The access point along Royal will not need to be relocated provided that the Engineering Department approves a modified drainage plan. The Landscape Plan should be modified to reflect the Streetscape Plan and should reflect certain criteria related to the following: 1. Primary Image Zone, 2. Secondary Intersection, and 3. Industrial land use. Within the primary image zones, "Cedar Elms are the dominant street tree in the median and the edges, accented with Redbud and Wild Plum and accent overstory trees of Sweet Gum or Chinese Pistache.' The secondary intersection should have "consistent landscape elements to include a 12" high plm~ting bed for annual and perennial flowers, background plantings of pink and white Crape Myrtles to highlight the bed, and accent overstory trees of Sweet Gum and Chinese Pistache.' The edge design should reflect an industrial land use. This calls for Live Oaks to "soften the edge and provide year-round screening." Approval will be contingent upon the Landscape Architect revising the plans. The Landscape Architect has modified the plans to reflect the requirements listed in the Streetscape Ordinance. The elevations show two shades of gray with aqua accent squares. Staff requested the applicant to show additional reveals, articulations and xvindows along the north elevation due to the size of the building and its frontage along Sandy Lake. The Zoning Ordinance makes this a requirement if a building exceeds 100' in length. The entrance fronting the intersection of Sandy Lake and Royal is recommended to be enhanced as this is one of the major entryways into Coppell. Page 3 of 5 Item # 4 The Architect has changed the following: 1. The soffits were raised from 10' to 12' in height. 2. The columns at each entry were extended 2' from the main structure vertically and horizontally; therefore, the longest expanse without articulation is 69.5'. 3. Canopies were added to each of the entry features, except the east elevation. 4. Can lights were added at each entry to provide shadows, which add interest to the building at night (on original submittal). 5. More accent squares were added (two on each side of the entry). 6. The future entry was added to create a continuous rhythm. RECOMMENDATION TO THE PLANN1NG AND ZONING COMMISSION: The Planning staff recommends APPROVAL of the Site Plan, subject to the following conditions being met: 1; 3) 4) was added to both sides of the entrance. 5) 6) A Tree Removal Permit will be required prior to removal of any protected trees on the site. Page 4 of 5 Item # 4 7) Tree Mitigation Tabulations on Existing Tree Plan are correct. A contribution to the City of Coppell Reforestation and Natural Areas Fund in the amount of $18,650 will be required. 8) Compliance with the attached Engineering plat comments. ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 5) Site Plan Elevations Tree Survey Landscape Plan Engineering Plat Comments Page 5 of 5 Item # 4