Loading...
Town Center L2B3-CS040630COl'FELL June 30, 2004 Scott D. Caruthers, P.E. Dowdy Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 Piano, TX 75093 RE: Town Center Addition, Lot 2, BIk 3 Fee Assessment Letter Dear Mr. Caruthers Enclosed is a copy of the City of Coppell Development Fee A~ssment table, along with a copy of the Development Fee calculations for the referenced developmen}/ Please make payment for the Impact Fees to the City of/C~ppell in the amount of $18,181.3Q and fom'ard to the Engineering Department along with a copy of[~d Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to issuance of the Construction Development Permit. Please note that the Texas Legislature, under Senate Bibl×243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. fi.l~ase provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% constructioCqnspection fee can be verified. The construction inspection fees must be paid prior to the scheduled p?e-construction meeting. The additional fees for water and se~er taps, water meters, and utility inspection fees need to be paid by separate check at the new Public/Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of ths/equired fees will help insure a snccessful beginning of this project. We look forward to v, orking with/~u on this project. If you have any questions, please contact me. Sincerely, / ~ Keith R. Marv//h, P.E. C/vii Eng~r cc: J~,nnife~r .A, ~,ns:rong, F. inance Director , ,,/Mary Beth Spletzer, Administrative Secretary, ,B, uilding Inspections ff Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE TABLE Project: Town Center Addition, Lot 2, Blk 3 Date: 6/29/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,640.00 (100% due at lssuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $188.48 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,046.30 ~ (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at lssuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $18,181.30 $18,181.30 (100% due prior to Council Approval) Street Light Fee Inlbrmation not Available (100% due prior to Acceptance of Project) [I Street Sign Fee Intbrmation not Available (100% due prior to Acceptance of Proiect) [I Construction Inspection Fee Information not Available (100% due prior to Start of Construction) Il FOTAL $26,636.08 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ l 8,181.30 D,-VELOPMENT FEE WORKSHEET PROJECT: Town Center Addition, Lot 2, Blk 3 DATE: 6/29/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 1 inch = 2 5 ESU's 0 = 0 ESU's I - 8 inch = 25 ESU's Total #: 13 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $5000 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to ~ssuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $61.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $1,984.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $5000 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $5000 ea (100% due prior to issuance of building permit) $3,640.00 $15000 $18848 $61.80 $0.00 $1,984,50 $3O.OO $60.00 $2,24O 00 $50.00 $5O.OO Park Fee (For Residential Developtnents Only): Page 1 D VELOPMENT FEE WORKSHEET Preliminary plat approved: After October 26, 1993 Single-family @ $000 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $000 $000 $18,18130 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development Once the plans are submitted, $29260 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULA'FIONS PROJECT: DATE: Town Center Addition, Lot 2, Blk 3 6/29/2004 ROADWAY IMPACT FEE: Service Area * 6 Category ** Commercial Land Use ** Commercial Others Not Specified Building Area (sf) 12,732 Development Units ** 12.73 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $18,18t.30 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)