Loading...
Town Center L2B3-CS040701coPPELL July 1,2004 Scott ID. Caruthers, P.E. Dowdy Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 Piano, TX 75093 RE: Town Center Addition, Lot 2, Blk 3 Fee Assessment Letter Dear Mr. Caruthers Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Lmpact Fees to the City of Coppelt in the amount of $0.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amoun! is a portion of the assessed fees that need to be paid prior to issuance of the Construction Development Permit. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered ',','hen those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE TABLE Project: Town Center Addition, Lot 2, Blk $ Date: 7/1/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,640.00 (100% due at Issuance of'Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance o£ Water Meter) Water Meter Fee (Domestic) $188.48 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,046.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 (100% due at Issuance of BuiIding Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $8,454.78 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Town Center ,,lddition, Lot 2, Blk 3 DATE: 7/1/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch : 8 ESU's 1 - 1 inch : 2.5 ESU's 0 = 0 ESU's 1 - 8 inch = 2.5 ESU's Total #: 13 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $61.80 Total #: 0 Additional Irrigation Meter(s) @ $000 Total #: 1 Fireline Meter(s) @ $1,984.50 (100% due prior to issuance of water meters) Domestic Water 1Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30,00 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 {Due prior to issuance of building permit) $280.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50,00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $3,640.00 $150.00 $188.48 $61.80 $0.00 $1,984.50 $30.00 $60.00 $2,240.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $0.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way, This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Town Center Addition, Lot 2, Blk 3 7/1/2004 ROADWAY IMPACT FEE: Service Area * 6 Category ** Commercial Land Use ** Commercial Others Not Specified Building Area (sf) 12,732 Development Units ** 12.73 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Veh cle Miles per Development Unit) x (Fee per Vehicle Mile) = $18,181.30 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1982 Univest Agreement, this properly can not be assessed for Denton Tap & Sandy Lake Rd. Therefore, no Impact Fees will be collected on this project.