Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PA9702-LR 990712
REPORT OF DRILLED PIER INSPECTION 8901 Carpalter h'a~., Igldb #100 Ddlms, Tens 7S247 Date of Service: 06/10/1999 Report No.: 9916013 Report Date 07/12/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co ell Project: Coppell Aquatic/Recreation Ctr 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached sheets for recorded data. NOTE: Pier depths adjusted to stay above the water table. Piers drilled as straight shaft piers due to caring of bells. Technician Time: 6:30 a.m. to 6:30 p.m. Tech~,i-,,~ Mike Odom ~ ~g, lne. Report Distribution: (1) cay ~/c~pea (1) city dc~pp~ - O)nrlnk~ySstSmtArchiteas (Day,/Copp~-SktS~p. Paul D. Smith, P.B. (l) T~ n-_~--ers (1) (~y d Coppell - Lemurs S~v Dq~ Sesior Project (1) H~saw & ThisRp~rti~c~u~dyfert~u~se~ftheciie~tindi`~ab~vea~h~11~~hM~em~~ 99~ Page I of 1 REPORT OF DRILLED PIERS ProJect: CoppellAquatic/Recreation Center Report No.: 9916013 300 Block ofPerkway Blvd, Coppell, Texas/Pd. #96051 Dat, ors~rv~c,: 06/10/99 ProJ~tNo.: 94991118 Technician: M. Odom Diving Pool P,ge: 1 of ] Pier Identification I 2 3 4 5 15 6 9 10 11 Pier Diameter (In.) 48 48 48 48 48 48 48 48 48 48 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A N./A Top of PIer Elevation (ft.) 86.3 92.5 92.5 92.5 92.7 86.3 93.0 93.5 93.5 93.5 Depth to Bearing Sltatum from Ground (ft.) See Note See Note See Note See Note See Note See Note See Note See Note ~ee Note See Note Depth of Pier from Ground (ft.) 8.5 6.3 6.5 6.2 6.3 8.5 6.5 6.5 7.0 7.0 Required Penetration (ft,) NIA N/A NIA N/A N/A N/A NIA N/A N/A N/A Actual Peneb'atton (ft.) N/A NIA NIA N/A N/A N/A N/A N/A N/A N/A Depth from Top of Conefete (ft.) 5,5 6.3 6.5 6.2 6.3 5.8 5.3 6.5 7.0 7.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dt7 D~ Plumb Within Toleanee (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) N/A NIA NIA N/A N/A N/A NIA NIA NIA N/A Oiled Depth (ft.) N/A N/A NIA N/A N/A N/A N/A N/A N/A N/A Number of Verlbel Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bur Size (~ 6 6 6 6 6 6 6 6 6 6 Length of VerUoul Burs (ft.) 5.0 5.6 5.8 5.6 5.6 5.2 4.7 6.0 6.2 6.3 Time Drllllng was Completed lO:lOa. m. lO:20a. m. lO:30u. m. fO:45e.m. 11:00a. m. 12:45p. m. 1:00p. m. 1:15p. m. :..45p. m. 2:lop. m TlmeConoreteweePlaeed 11:15a.m. 11:25a. m. 11:,lOs.re. 11:55e. m. 12:45p.m. 1:30p.m. 1:05p.m. 2:15p.m. :30p.m. 3:45p. rn.