Loading...
ST9302-CN 940519Rady & Associates, Inc. Engineers · Architects · Planner~. May l9, 1994 Mr. Ken Griffin, P.E. Assistant City Manager City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Design of Median Opening Alternatives Sandy Lake Road and 24" Waterline Coppell No. ST 93-02 R&A No. 93021.00 Dear Ken: This letter is in regards to additional services provided in the design of median opening alternatives at the west end of Sandy Lake Road, east of Denton Tap Road, adjacent to an existing and proposed shopping center. The following is a breakdown of hours necessary to design, evaluate and adopt a final layout of median openings and right and left mm lanes: RJM 10 hrs. @ $85.00 $850.00 RJJ 37 hrs. @ $55.00 2,035.00 Cler 0.5 hrs. @ $35.00 17.50 Directs $108.50 TOTAL: $3,011.00 Since completing our field surveys, some changes have occurred at the east end of Sandy Lake Road due to development on the north side of Sandy Lake Road, west of McArthur Blvd. To have this resurveyed and added to our existing CADD files will cost an estimated $870.00. The hourly breakdown is as follows: Survey Field Work Survey - Office Cadd Input and File Manipulation Project Coordination $430.00 $115.00 $137.50 $187.50 TOTAL: $870.00 910 Collier Street · Fort Worth. Texas 76102-3542 · 817/335-6511 ° Metro 817/654-4266 · Fax 817/335-5070 We have 200 feet of survey cross-sections remaining in our original contract which will cover the necessary survey needs west of Denton Tap, once a terminus point is identified by the City for the 24" waterline bore. If this meets with your approval, please sign in the space provided. Please retain one copy for your records and remm the other copy to us. We appreciate this opportunity to serve you and the City of Coppell. Sincerely, RADY & ASSOCIATES, INC. CITY OF COPPELL, Jim Witt Citf Manager RJM/pb P:\93021.00\93021 LTR\MEDNPROP. WP RADY AND ASSOCIATED, INC., Wm. Bennett Ratliff, P.E. Vice President