Loading...
Freeport NIP(8.0)-CS040527DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke-Freeport Addition~ Lots 6 and 7~ Block AT Replat, being a replat of a portion of Lot 2, Block A, to allow the construction of a 140,000-square- foot building on Lot 6 and a 70,000-square-foot building on Lot 7, totaling approximately 14.13 acres of property located along the west side of Freeport Parkway, south of Creekview Drive, at the request of Duke Realty Corporation. STAFF REP.: Matt Steer PROJECT ID# RP-04-0036 DRC DA TE: May 27, 2004 and June 3, 2004 CONTACT: Kenneth M. Gri~fn, P.E., Dir. o~ EnGineering/Public }Forks 972/304-3686 COMMENT STATUS: ,/PRELIMINARY FIN.~L P. EFISED .4FTER P&Z Plat document - 1. There are two areas called out as 20' drainage easements by this plat that cross Lot 6 to accommodate drainage from Lot 7. Those easements shall be called private easements and are to be maintained by the individual property owners. The City will not perform maintenance on those storm drain lines. 2. On Lot 7 you show a 10' water easement and a 15' sanitary sewer easement again, those will not be City owned or maintained lines. The water and sewer to serve Lot 6 should be located on Lot 6, so that those easements are not required. Grading Plan sheet - 1. The finish floor elevation of the buildings should be shown. Drainage Plan - 1. The storm drainage system will be privately owned and maintained. The City of Coppell will not perform maintenance, so you will need some sort of agreement with the adjacent property owners. Water & Sewer Plan - 1. The fire line on Sheet C4.0 shows tying into the existing system on Lot 5 Block A. That is a privately owned and maintained system and as such needs to remain independent of this fire line. Loop your fire line exclusive of this property. 2. The same is true of the fire line on Lot 6 versus Lot 7 - those also need to be independent of each other. 3. This is also true of the water and sewer service to these two buildings. You cannot combine the services, they must be independent which will require the extension of the existing 8" sanitary sewer onto Lot 7 and two service lines, one for Lot 7 and one for Lot 6. 4. Water service will need to be relocated from Lot 7 to Lot 6 to serve the Lot 6 building as well. Additional comments may be forthcoming during the full engineering review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-186R6~ Duke-Freeport, zoning change request from PD-186R3 (Planned Development-186 Revision 3) to PD-186R6 (Planned Development-186 Revision 6), to attach a Detail Site Plan to Lots 6 and 7 (formally Building 3), to allow the construction of a 140,000-square-foot building on Lot 6 and a 70,000-square-foot building on Lot 7, totaling approximately 14.13 acres of property located along the west side of Freeport Parkway, south of Creekview Drive, at the request of Duke Realty Corporation. STAFF REP.: Matt Steer PROJECT ID# PD-0035 DRC DATE: May 27, 2004 and June 3, 2004 CONTACT: Kenneth M. Griffin, P.E., Dir. o~En~ineering/Public Works 972/304-3686 COMMENTSTATUS: '/PRELIMINARY F!AS~L P,~,~V!$E~ ,~FTER P&Z 1. Make sure Tree Mitigation Plan includes the trees that are to be removed in the right-of-way where left turn lane and median openings are to be constructed. 2. Make sure visibility issues are addressed for the median openings when the left turn lanes are completed. Some of the trees may be within a visibility area.