Loading...
Magnolia Rest-CS040513 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Per Birdsall, Traffic & Streets Operation Manager Rick O'Dell, Construction Inspector ~),/'~--~ May 13, 2004 Traffic Signal Loop - Natches Trace @ Denton Tap Rd FYI - I made contact with the contractor for Deliman's Grille and he assured me that they would come next week to complete repairs to the loop. As I told him in a notice sent this week, if they do not repair it by May 21st we will do the work and bill him for the cost of the repair. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"