Magnolia Rest-CS040513 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Date:
RE:
Per Birdsall, Traffic & Streets Operation Manager
Rick O'Dell, Construction Inspector ~),/'~--~
May 13, 2004
Traffic Signal Loop - Natches Trace @ Denton Tap Rd
FYI - I made contact with the contractor for Deliman's Grille and he assured me that they would
come next week to complete repairs to the loop. As I told him in a notice sent this week, if they do
not repair it by May 21st we will do the work and bill him for the cost of the repair.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"