Loading...
Magnolia Rest-CS040708T H E - C I T Y - O F COl'FELL July 8, 2004 Dean Preston Purple Mountain Construction Services, Inc. 4712 Memphis Street Dallas TX 75207 RE: Magnolia Restaurant Addition, Deliman's Grille Final Acceptance Pending/Invoice for Repair Dear Mr. Preston; The attached invoice is for repair to the traffic control loop at the Natches Trace/Denton Tap Road intersection that was left in an excavated and unrepaired state during the construction of the Deliman's Grille in December of 2003. Your company was notified by letter dated May 10, 2004 (copy enclosed) to repair the damage to City of CoppelI standards by May 21, 2004 or the City would repair the damage and bill your company for the full extent of the repair. City personnel completed the repair on June 16, 2004. Please remit a check for $594.49 made to the order of City of Coppell and enclose a copy of the work order summary. The check should be mailed to Finance Dept., 255 Parkxvay Blvd., Coppell TX 75019 Sincerely, Rick O'Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 Enclosure CCi Kenneth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, Assistant Director of Public Works Finance Department City' of Coppell Department of Public Works Work Order Summary Work Order ID Category Type Cross Street Location Description WOTC-04-2015 InitialDate 6/16/2004 Traffic Control Stact Date 6/14/2004 Traffic Signals FinalDate 6/16/2004 Brent Adams ¢105 DT/Nat Tr #105 DT/Nat Tr #105 DT/Na[ Tr Make repairs to loops 2-4, 2-5, 2-6 that were damaged during the constructon of Deliman Grill. Equipment Date 6/i6/2004 Description Quantity Unit Cost Per Bucket Truck 85 10 Hour Extended Cost $85 O0 Equipment Subtotal $85.00 Parts 6/16/2004 6/16/2004 6/16/2004 6/16/2004 6/16/2004 6/16/2004 Couplings 2" 4 1.19 Each Lead in Cable 14ga 50 2 500 16 foot PVCpipe 10' X 2" lengths 1 549 Each Pull boxes 1 98 Each Sweep 90 deg 2" 2 4.29 Each Wire nuts 12 43 Each $476 $80.00 $549 $98 O0 $858 $5 16 Parts Subtotal $201.99 Personnel 6/16/2004 6/16/2004 6/16/2004 6/16/2004 BrentAdams 85 15 Hour CodyWildoner 5 5 15 Hour FrankGa~a 55 15 Hour Larry Morton 1 15 Hour $12750 $82 50 $8250 $15.00 Personnel Subtotal $307.50 Work Order Total $594,49 June 16, 2004 1