Loading...
St Joseph-CS011107Demo Water 500,000 Water Tank & Appurtenances Exhibit C-1 Scope of Work: Demo a 500,000 gal water. Cut and cap water lines and abandon lines in place without filling them. Cut four 10' trenches in tank floor, remove concrete, and fill with crushed stone to make openings for natural drainage. Cave-in roof and column. Knock in sides 4' below bottom of road base. Push pump station and other st~ctures into tank Fill and compact in lifts to ground level. (Remove fence and trees and raise site to final grade is not included.) ~'~ Assumptions: /¥0.] 1. Thereis nohauling. All concrete waste can be buried inside the tank// /' ~ ~ N// ~ / / 4. Voidsin demo'd concrete can be filled with sand or select material. ~,,~ ~' 5. Concrete debris from Pump Station demo can be pushed into tank for Dl:~'ial 6. Assume no hazardous waste on the site. 7. Assume that active electrical circuits can be disconnected and removed from nearby transformers. Description Cut and Cap existing lines Saw Cut Trenchs in Tank Floor Knock in Roof and Sides Demo Pump House Fill (common borrow) for Tank 80% of tank volume Qty Unit 2 ea 100 If 2 da I da 2308 cy Unit price Line Total $ 1,000.00 $ 2,000 $ 65.00 $ 6,500 $ 6,000.00 $ 12,000 $ 4,500.00 $ 4,500 $ 10.00 $ 231083 $ 48,083 $ 10~00 $ 1"46~667 Tota,. s ,75o