Vista Point II-CS040603DE VEL OPMENT R E VIE W COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-199R-HC~ Vista Point II, zoning change request from PD-199-HC
(Planned Development-199, Highway Commercial) to PD-199R (Planned
Development-199 Revised, Highway Commercial) to attach a Detail Site
Plan to Tract 1, to allow the construction of three
office/assembly/warehouse buildings totaling 93,550-square feet on 9.1
acres of property located south of State Highway 121, west of MacArthur
Blvd., at the request of Chris Gardner of Jackson Shaw.
STAFF REP.: Marcie Diamond PROJECT ID# PD-04-0031
DRC DATE: May 27, 2004 and June 3, 2004
CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerin~/Public Works 972/304-3686
COMMENT STATUS: ,/PRELIMINARY F!N.~L ~
Site Plan -
1. Driveway spacing shown adjacent to SH 121 needs to be reviewed and approved by TxDOT
and a deceleration lane is needed to serve those driveways.
Additional comments may be forthcoming during the full engineering review.
See the next case for additional comments on the plat document.
NOTE: General Engineering Observations
These comments do not constitute a detailed review of any Engineering submittals.
Detailed review will be performed after approval by City Council.
Site Plan -
1. There is a limit of construction line shown; will anything be constructed with this phase on
the other side of this limit line? Specifically, I have questions regarding the extension of
underground utilities to that property.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Vista Point II Addition Lots 1-7~ Block A~ Replat,_being a replat of Lot
3P,, Block G, of the Vista Ridge Addition, to allow the construction of the
first phase of development consisting of three office/assembly/warehouse
buildings totaling 93,550-square feet on 9.1 acres of this 25.8 acre tract
located south of State Highway 121, west of MacArthur Blvd., at the request
of Chris Gardner of Jackson Shaw.
STAFF REP.: Marcie Diamond PROJECT ID# RP-04-0032
DRC DATE: May 27, 2004 and June 3, 2004
CONTACT: Kenneth M. Gri~n, P.E., Dir. of En~ine
COMMENT STATUS: ,/PRELIMINARY
~rin~/Public Works 972/304-3686
Final Plat -
1. We need a 25' x 25' easement for the water vault adjacent to SH 121.
2. There is no mutual access shown spanning the line between Lot 1 and Lot 2, yet the Site Plan
shows a driveway.
3. Provide right-of-way for deceleration lanes. You are showing to abandon the existing right-
of-way for the deceleration lanes, but you are not showing a rededication for the new
deceleration lanes.
4. Driveways on SH 121 and at least the first driveway on MacArthur Blvd. are within the limits
of the City of Lewisville and/or TxDOT right-of-way. The plans for the driveways will also
need to be reviewed and approved by those two entities.
5. A 25' x 25' easement will be needed on Lot 5 for the future fire vault.
6. Several areas show "limits ofmntual access." How do you intend to keep the fire lane open
but prevent access across these lots?
Preliminary Water & Wastewater Layout -
1. The 10" detector check adjacent to SH 121 needs to be located within an easement and is to
be shown on the plat.
2. The 8" detector check adjacent to Forest Hill Drive appears to be in an easement, verify that
the proposed location is correct.
Preliminary Drainage Layout -
1. TxDOT and/or City of Lewisville needs to review and accept the proposal to tie into the
existing culvert within the TxDOT right-of-way.
2. Show calculations on the downstream system. If that system is inadequate to collect the 100-
year storm event, onsite detention may be required.
Additional comments may be forthcoming during the full engineering review.
NOTE: General Engineering Observations
These comments do not constitute a detailed review of any Engineering submittals.
Detailed review will be performed after approval by City Council.
Preliminary Water & Wastewater Layout -
1. What are the limits of construction on the water and sewer lines? There is no stopping point
indicated such as a blow-off or plug for these lines.
2. On the second sheet where future construction is indicated - ensure that all services and/or
hydrants are on City of Coppell waterlines not on Lewisville lines. There are parallel lines in
that area belonging to each city. Is there anything on this sheet that will be built with this
phase of construction?
Preliminary Drainage Layout -
I. Provide a table of drainage areas and a drainage map showing the offsite drainage.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-199R-HC~ Vista Point II, zoning change request from PD-199-HC
(Planned Development-199, Highway Commercial) to PD-199R (Planned
Development-199 Revised, Highway Commercial) to attach a Detail Site
Plan to Tract 1, to allow the cons~'uction of three
office/assembly/warehouse buildings totaling 93,550-square feet on 9.1
acres of property located south of State Highway 121, west of MacAr~hur
Blvd., at the request of Chris Gardner of Jackson Shaw.
STAFF REP.: Marcie Diamond PROJECT ID# PD-04-0031
DRC DATE: May 27, 2004 and June 3, 2004
CONTA CT: . P.E., Dir.
Works 972/304-3686
No Comments
Comments may be forthcoming during the full engineering review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Vista Point II Addition Lots 1-7~ Block A1 Replat,_being a replat of Lot
3R, Block G, of the Vista Ridge Addition, to allow the construction of the
first phase of development consisting of three office/assembly/warehouse
buildings totaling 93,550-square feet on 9.1 acres of this 25.8 acre tract
located south of State Highway 121, west of MaeArthur Blvd., at the request
of Chris Gardner of Jackson Shaw.
STAFF REP.: Marcie Diamond PROJECT ID# RP-04-0032
DRC DATE: May27, 2004and June3, 2004
CONTACT: Kenneth M. Gri~n,P.E.,Dir. of En~ine
COMMENT STATUS: ~dgJ~4~g~-
:rin~Public Works 972/304-3686
~ FINAL I tggl~4gEO
I
Final Plat -
1. There is no mutual access shown spanning the line between Lot 1 and Lot 2, yet the Site Plan
shows a driveway. Driveways shall not span the lot line with no provision for mutual access.
2. Driveways on SH 121 and at least the first driveway on MacArthur Blvd. are within the limits
of the City of Lewisville and/or TxDOT right-of-way. The plans for the driveways will also
need to be reviewed and approved by those two entities.
Preliminary Drainage Layout -
1. TxDOT and/or City of Lewisville needs to review and accept the proposal to tie into the
existing culvert within the TxDOT right-of-way.
2. Show calculations on the downstream system. If that system is inadequate to collect the 100-
year storm event, onsite detention may be required.
Additional comments may be forthcoming during the full engineering review.