Loading...
SS0201-LR040707Rt Client: Project: Services: lneers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Service Center Sanitary Sewer Project SS 02-01 Report No.: 212457 Project No.: 049073 Date of Service: 06/24/2004 Report Date: 07/07/2004 Reinforcing Steel Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection. The results are attached. Technician Time: 10:30am - ~2:00pm Page 1 of 2 ***REVISED 7/7/04 to reflect the correction of discrepancies prior to concrete placement. The compliance statement was inadvertently omitted from the orig,' report*** Technician: Jon Germer Report Distribution: (1) City of Coppell (1) City of Coppell Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject ma~er provided by persons or conditions over which we have no control. Our legters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wri'aen approval of Rone Engineers, Ltd. Client: 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION City of Coppell Ms. Suzmu Taylor PO Box 9478 Coppell TX 75019 Report No.: 212457 Project No.: 049073 Date of Service: 06/24/2004 Report Date: 06/29/2004 Service Center Sanitary Sewer Project SS 02-01 Services: Reinforcing Steel Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Jon Germer Report Distribution: (1) City of Coppell (1) City of Coppell lO:30am - 12:00pm Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone En~neers, Ltd. RoneEngineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Report of Reinforcing Steel Inspection Project No.: Project: 5~_~x/!C-.~ ~'~_2~ DateofService: Locations and Items In~ected: b I~ ~ 5 -- ~ ' / / Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming Placing Drawings ~er. Bar Length J Column Ties Properly Approved and Shape · Tied and Spaced Bar Size ~ , Proper Bar Placement J ·r Stirrup Spacing and Type Bar Grade ~ er Properly Tied a,,'~/ Lapped Splices -- ~ars Clean /~ ~' Dowel Bars in Place ~ Welded Splices Discrepan. cies / Comments: Inspector's Signature: Time: to Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No