SS0201-LR040706ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Service Center Sanitary Sewer Project SS 02-01 Report No.: 212217 Project No.: 049073 Date of Service: 06/21/2004 Report Date: 07/06/2004 Services: Drilled Pier Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Drilled Pier Inspection. The results are attached. Technician Time: 7:30am - 3:30pm Page 1 of 3 Technician: Gary Kmnrath Report Distribution: ( I ) City of Coppell (I) City of Coppell pre e~ct Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in ~11 without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: City of Coppell Report No.: 212217 Project No.: 049073 Project: Service Center Sanitary Sewer Date of Service: 6/21/2004 Project SS 02-01 Page 2 of 3 Driller: Allied Drilling Pier Identification 1 +64 1 +82 2+00 2+ 18 2+36 ?ier Diameter (in) 20 20 20 20 20 Depth of Pier From Surface (fi) 11.10 11.20 11.70 12.30 11.50 Depth of Bearing Stratum From Surface (fi) 4.10 3.70 4.80 5.00 5.10 Required Penetration (fi) 6.00 6.00 6.00 6.00 6.00 Actual Penetration (ft)* 7.00 7.50 6.90 7.30 6.40 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size 6/#5 6/#5 6/#5 6/#5 6/#5 Length of Reinforcing Steel (fi) 13.10 13.70 14.80 15.00 13.80 Time Drilling was Completed (am / pm) 10:05 AM 10:42 AM 11:40 AM 1:45 PM 2:20 PM Time Concrete was Placed (am / pm) 12:15 PM 12:30 PM 12:50 PM 3:30 PM 4:05 PM Depth of Pier From Top of Concrete (fr) 11.85 14.53 15.70 16.08 14.53 Elevation: Surface (fi)** 488.61 486.78 486.86 487.83 489.33 Elevation: Top of Pier (fi)** 489.36 490.11 490.86 491.61 492.36 Elevation: Bottom of Pier (fi)** 477.51 475.58 475.16 475.53 477.83 Elevation: Top of Bearing Stratum (ft.)** 484.51 483.08 482.06 482.83 484.23 Bearinl~ Stratum (description) Gray Shale Note: See report 212218 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others Remarks: .IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: City of Coppell Report No.: 212217 Project No.: 049073 Project: Service Center Sanitary Sewer Date of Service: 6/21/2004 Project SS 02-01 Page 3 of 3 Driller: Allied Drilling Pier Identification 2+54 ~ier Diameter (in) 20 Depth of Pier From Surface (it) 14.50 Depth of Bearing Stratum From Surface (fi) 7.60 Required Penetration (ft) 6.00 Actual Penelration (fi)* 6.90 Condition of Bottom (wet / dry) Dry Plumb Within Tolerance (yes / no) Yes Casing Dimneter (in) / Casing Length (ft) NA Number of Bars / Reinforcing Bar Size 6/#5 Length of Reinforcing Steel (ft) 15.00 Time Drilling was Completed (am / pm) 2:50 PM Time Concrete was Placed (am / pm) 4:30 PM Depth of Pier From Top of Concrete (it) 15.47 Elevation: Surface (it)** 492.14 Elevation: Top of Pier (it)** 493.11 Elevation: Bottom of Pier (it)** 477.64 Elevation: Top of Bearing Slratum (it.)** 484.54 Bearing Stratum (description) Gray Shale Note: See report 212218 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others Remarks: Note 1: All noted pier identification is with respect to horizontal stationing as received from surveying persormel present on site. Note 2: Start of drilling operation at approximatelly 9:30am following drilled pier location layout. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no respensibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our ietters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd