SS0201-LR040629Client:
Project:
;ers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
City of Coppell ~
Ms. Suzan Taylor ~
PO Box 9478
Coppell TX 75019
Report No.: 212457
Project No.: 049073
Date of Service: 06/24/2004
Report Date: 06/29/2004
Service Center Sanitary Sewer
Project SS 02-01
Services: Reinforcing Steel Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 2
Technician: Jon Germer
Report Distribution:
(1) City of Coppell
(1) City of Coppell
10:30am - 12:00pm
Clay Stark
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality
(composition, appearance, performance, ete) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fialI without the written approval of Rone Engineers, Ltd,
)~DD
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Report of
Reinforcing Steel Inspection
~ I
Project No.: 0 ?'~'/O ~'~ ~
Project: 5~..~/:C-~ /r~4t~'~-~-- Date of Service: ~/2 /
Locations and Items Inwected: g I~ ~ ~ -- ~ '
Items InsPeCted: Conforming Non Items Inspected: Conforming Non Items lns!~ted: Conforming Non
Conforming Conforming Conforming
Placing Drawings ~r~ Bar Length / Column Ties Properly
Approved and Shape r Tied and Spaced
Bar Size ~, Proper Bar Placement ~ ~' Stirrup Spacing and Type
Bar Grade J~ / Properly Tied t~'~e, Lapped Splices ~
Bars Clean I~ ~' Dowel Bars in Place ~ Welded Splices
Form Clean J Proper Bar Supports ~ ~ {echanieal Splices
'-lumber Bars l~~ Proper Cover ~,~
Discrepancies / Comments:
Inspector's Signature:
Time: to
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
City of Coppei1
Ms. Suzan Taylor
PO Box 9478
CoppeI1 TX 75019
Service Center Sanitary Sewer
Project SS 02-01
Report No.: 212545
Project No.: 049073
Date of Service: 06/25/2004
Report Date: 06/29/2004
Services: Perform In-Place Density Test in accordance with ASTM Standards.
PROJECT DATA
CONTRACTOR: Fox Contractors
Test Methods: ASTM D-2922
ASTM D-3017
Standard Counts
Gauge: Troxler 3430 Moisture Density
Gauge Serial No: 31580 Current: 702 Current: 251 $
Test Mode: DT Previous: 686 Previous: 2526
ML/D No. Description
1 Dark Brown Clay
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
Moisture % Density pcf Moisture Density
22.5 96.5 Optimum +5 95 - 100
FIEI ~D DENSITY TESTS
TEST LOCATION
TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
NO DEPTH No. (%) (pcf) (pcf) (% max)
Utility backfill
1 Sanitary sewer, Station 10+50, 12' below 6" 1 27.0 118.9 93.6 97
grade
Utility backfill
2 Sanitary sewer, Station 10+50, 9' below 6" 1 25.4 120.8 96.3 I00
grade
Utility backfill
3 Sanitary sewer, Station 10+50, 6' below 6" 1 26.7 120.7 95.3 99
grade
Utility backfill
4 Sanitary sewer, Station 10+50, 3' below 6" 1 27.2 120.6 94.8 98
grade
Utility backfill
5 Sanitary sewer, Station 10+50, 1' below 6" 1 27.1 121.5 95.6 99
grade
LEvlITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject ma~er provided by persons or conditions over which we have no control. Our leaers and
reports are for the exclusive use of the clients to whom they are addressed and shalI not be reproduced except in full withom the written approval of Rone Engineers, Ltd.
o7gg Pa~e 1 of 2
RoneEngineers
Report No.: 212545 l~l
Project No.: 049073 Client: City of Coppell
Technician: Doyle Mackey
Report Distribution:
(i) City of Cappell
(I) City of Coppell
Test results on this report meet project specification. ~
Started: II:30a Finished: 12:45p go
{,..~la~g Stark
Projekt Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shag not be reproduced except in fall without the written approval of Rone Engineers, Ltd.