Loading...
SS0201-LR040624ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Project: City of Coppeli Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Service Center Sanitary Sewer Project SS 02-01 Report No.: 212326 Project No.: 049073 Date of Service: 06/22/2004 Report Date: 06/24/2004 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Fox Contractors Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 31580 Test Mode: DT Moisture Current: 702 Previous: 701 Standard Counts Density Current: 2465 Previous: 2471 M/D No. Description 1 Dark Brown Clay MOISTURE DENSITY RELATIONS Maximum Moisture % Densit~ pcf 22.5 96.5 Project Requirements Moisture Density Optimum +4 95 rain 2 Brown Tan Silty Sandy Clay 12.5 117.0 Optimum +4 95 rain FIELD DENSITY TESTS TEST NO TEST LOCATION Utility Backfill 1 Sanitary sewer, Station 7+50, 12' below grade Utility Backfill 2 Sanitary sewer, Station 7+50, 9' below grade Utility Backfill 3 Sanitary sewer, Station 7+50, 6' below grade Utility Backfill 4 Sanitary sewer, Station 7+50, Y below grade PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pc0 (pct) (% max) 6" 1 27.2 120.6 94.8 98 6" 1 26.4 121.0 95.7 99 6" 1 26.7 120.7 95.3 99 6" 1 27.1 121.5 95.6 99 LIMITATIONS: The test results presented herein were prepared based upon the specific smmples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mailer provided by persons or conditions over which we have no control. Our letters and report* are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the wrilten approval of Rone Engineers, Ltd. RoneEngineers Report No.: 212326 l~l Project No.: 049073 Client: City of CoppeI1 TEST NO PROBE TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pc0 (% max) 5 Utility Backfill Sanitary sewer, Station 7+50, 1' below6" 1 25.4 grade Test results on this report meet project specification. Technician: Doyle Mackey Report Distribution: (1) City of Coppell (1) City of Copp¢ll Started: 12:30p Finished: 2:15pm I20.8 96.3 100 Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition appearance, perforrnonce, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. OCr letters and reports are for the exclusive use of the clients to whom they are addressed and sba not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, See. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Service Center Sanitary Sewer Project SS 02-01 Report No.: 212067 Project No.: 049073 Date of Service: 06/17/2004 Report Date: 06/24/2004 Services: Perform In-Place Density Test in accordance with ASTM Standards. CONTRACTOR: Fox Contractors Test Methods: ASTM D-2922 ASTM D-3017 PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 24324 Test Mode: DT Standard Counts Moisture Density Current: 574 Current: 2198 Previous: 574 Previous: 2197 M/D No. Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Project Requirements Moisture Density 1 Dark Brown Clay 22.5 96.5 Optimum +5 95 min 2 Brown Tan Silty Sandy Clay 12.5 117.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pci) (pcO (% max) Utility backfill I 18" sewer line, Station 4+50, 1.5' below 6" 1 28.1' 117.3 91.6 95 grade Utility backfill 2 18" sewer llne, Station 4+55, 4' below grade 6" 2 13.7 126.6 111.3 95 Utility backfill 3 18" sewer line, Station 4+60, 5.5' below 6" 2 22.4* 120.4 98.4 84 * grade Utility backfill 4 18" sewer line, Station 4+65, 7' below grade 6" 2 20.0* 123.7 I03.1 88* Utility backfill 5 18" sewer line, Station 4+70, 9' below grade 6" 2 22.9* 124.9 101.6 87 * LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Om- leRers ,and reports me for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Lta. 07DB Page 1 of 2 RonsEngineers Report No.: 212067 l~l Project No.: 049073 CLient: City of Coppell An asterisk (*) appears next to test results which do NOT meet the t Technician: Scott Fagan Report Distribution: (1) City of Cappell (1) City of Coppell >roject s~/~ Projffct Manager Started: l:30pm Finished: 3:00pm LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporis are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the writsen approval of Rone Engineers, Ltd. c~,~n Page 2 of 2