DR0301-CS040622 (2) T H E C [ T Y 0 F
co??-ELL
SHADOWRIDGE ESTATES RETAINING WALL
DR 03-01
Preconstmction Conf'erenc¢ Agenda
.lunc 22, 2004 (~ 10:00 a.m.
1. Franchised Utilities
2. City of Coppell Guidelines
a) Working hours
b) Noisc ordinance
c) Changes to plans or specifications
d) Sanitary facilities
Extra hours
e) Ali water must be metered
g) Tree protection'-'-~
h)
i)
Public Services: Phone No. (972)-462-5150
John Elias: Phone No. (972)-462-5I 15 c'/
K'~ep set o~'~onstructi~n S-~andards on site
Responsible party on site at all times
j) Periodic meetings as need
3. Contract Time / Liquidated Damages
4. Submittals
a) Responsiblc person Name and 24 hour number
b) List of subcontractors with contact person and phone number
c) Monthly estimate form
d) Materials
~'~ straight shaft groutcd tiebacks
3' x 3' PVC coated gabions
gabion rock
geotextile fabric
crushed stone drainage mater/al
concrete batch design for each mix
~s
c:v3t-a-set of concrete cylinders (4) per each days placement
~api c s xg-alMe~resu It s.
Pay Items
COP ELL
SItADOWRIDGE ESTATES RETAINING WALL
DR 03-01
Preconstruction Conference Agenda
June 22, 2004 ~ 10:00 a.m.
1. Franchised Utilities
2. City of Coppell Guidelines
a) Working hours Extra hours
b) Noise ordinance
c) Changes to plans or specifications
d) Sanitary facilities
e) All water must be metered
f) Tree Protection & Removal
g) Maintain Drainage
h) Keep set of Construction Standards on site
i) Responsible party on site at all times
j) Periodic meetings as need
Public Services: Phone No. (972)-462-5150
John Elias: Phone No. (972)-462-5115
3. Contract Time / Liquidated Damages
4. Submittals
a) Responsible person Name and 24 hour number
b) List of subcontractors with contact person and phone number
c) Monthly estimate form
d) Materials
straight shaft grouted tiebacks
e) SW3P & Posted Notice P 5-2
3' x 3' PVC coated gabions
gabion rock
geotextile fabric
crashed stone drainage material
concrete batch design for each mix
Construction Staking
Construction Schedule
Testing
Pay Items
2
Craig Olden, Inc.
Specialists in the Design and Construction
of Earth Retention Systems
June 22, 2004
PROJECT: Shadow Ridge Estates, Coppell
Dallas, Texas
COINC No.: 04-058
CONTACT LIST
Mr. Blackie Vargas
Mr. Chris Dixon
Mr. Raul Lara
Ms. Cindy Holifield
Ms. Vicki Stephens
Ms. Alicia Sheeder
Area Superintendent
Construction Operations Manager
Project Manager
Project Foreman
Asst. Operations Manager
Accounts Receivable
Payroll
Mobile: 214/801-6448
Home: 972/826-0299
Office: 972/294-5000x108
Mobile: 214/384-7286
Fax: 972-294-2664
cdixonC, crai,qoldeninc.com
Mobile: 214-808-4925
Office:
Office:
Office:
972/294-5000xl 07
972/294-5000xl 21
972/294-5000xl 20
P.O. Box 5000 ° Little Elm, Texas 75068 · Dallas 972 / 294-5000 ° 1-800-GABIONS · FAX 972 / 294-2664 · www. gabion.com