ST9905-MP040714BETHEL ROAD I ON. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp· iD Task Name DESIGN PHASE 2 Design / Drainage Study 3 Project Meeting 4 Utility Plans 5 Project Meeting 6 60% Plans 7 Drainage Study (First Submittal) 8 Drainage Study (Second Submittal) Project Meeting 10 Project Meeting 11 Project Meeting 12 Field Meeting 13 Project Meeting ~ 4 80% Plans 15 Project Meeting 16 90% Plans 17 Project Meeting i 8 Advertisement 19 Bid Opening 20 City Council 21 PERMITS 22 CORPS OF ENGINEERS (Alan Plummer, Inc.) THC - Historical Structure ( Bridge over Stream Gl) 24 THC - Archaeological (Roadway and Channel) 25 TAS 26 RIGHT-OF-WAY (ROADWAY) 27 Parcel #1 - Fellowship of Las Colinas (ROW/TCE) 28 Acquired by City 29 Parcel #3 - Walter Hogg Partnership (ROW/SE/TCE) 30 Initial Contact by City 31 Acquired by City 2001 2002 2003 2004 2005 2006 Q4-~Q2~Q3 Q_4_.9_1. Q.. ~2~Q_3__Q~4 Q1 Q2 Q3 Q4 _Q.I_~Q2~_Q~.3_~QQ4~Q~ Q2 Q3 Q4 Q1 Q2 Q3 · 2/8 [ i/i~ ............... 1/14 i 10j 7"i I I... I · i l L 12/3 12/3 · 2/13 l i 71'8 .......... Project: ST 99-051 Task Milestone · Summary ~ Deadline Date: Mon 7/12/04 Page1 BETHEL ROAD I (VV. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp. 2001 2002 2003 ! 2004 2005 200~ ID TaskName ,Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 G~ Q4:Q1 Q2 Q~ Q4 Q1 Q2 Q~ 33 Acquired by City , ~kj 6/8 34 Parcel ~ - Gulf United Industries (ROW/TCE) i .... ~ 12/$,' ' 35 Acquired by City ~) 10/29 , 36 Parcel ~6. Texas Dugan Limited Partnership (ROW/TCE) · 12/$ ~ ' 37 Initial Contact by City,J ~ 8111 38 Acquired by City 39 Parcel #1 - Hillwood Investment Properties (ROW/TSE/TCE) 1~/3 40 Acquired by City ....... ( 1 4i Parcel #8 - Minyard Food Store (ROW/TCE/DE) ....... · 7/1 42 Acquired by City ..... :~ ' '" ....... ~ 4/,~2 43 Parcel #9. Texas Dugan Limited Partnership (ROW/TCE) · 711 , 44 Initial Contact by City {.~ 9/11 45 Acquired by City , I ' 46 Parcel #10 - City of Coppell (ROW/I'CE) ' ~k ?il I, ..... 49 Acquired by City i ..1 l ..... ~0 Parcel #12 CiCi Addition (TCE) .........~, ~, 7/1 Acquired by City ........ ~ 12i10 52 RIGHT-OF-WAY (CHANNEL) ...... 53 City of Copp.ll (BE) &; 9/0 54 Chadick Capital LP. (DE) ~.'. 6/9 55 (DE) ~,i $/9 .... Michael & Graciela Chase 56 Chadick Capital LP. (DE) ............ --; "~'"'-6/0 58 Utilities Notified ' A l~i~e ........ , ........ 59 ; 60% Plans Sent ' · 3ia ............ ~ ...... 60 Drainage Utility Schematic Sent :I j $/13 6i~ 80% Plan Provided i · 11113 62 Explorer Pipeline Project: ST 99-05 I Task Milestone · Summary ~ Deadline Date: Mon 7/12/04 Page2 BETHEL ROAD I (VV. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp. 2001 2002 2003 2004 2005 2006 'l'aSk~rn~ .~_4 QljQ2~3~Q~ Q1 Q2 ~3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 ?~ 64-Q1~2 ~ Q4 Q1 Q2 Q3 64 TXU Electric Delivery ~ {' ~ '' i ..... 66 CoServe Elec r c & Te ecommun cat ons ........ , ', ....../ 67 TXU Comrnun cat ons ; ~ ...... 68 Brower Design Services I 73 74 75 ~B 77 78 Relocation Plans Received AT&T Local Network Services (complete) Metromedia Fiber Network Services (complete) SW Bell Telephone (complete) 360Net (Touch America) - c/o Power Engineers Relocation Plans Received Qwest Relocation Plans Received OnFiber Carrier Se~ices McLeod Telecommunications CONSTRUCTION 80 Notice to Proceed 81 Construction Project: ST 99-05 I Task Milestone · Summary ~ Deadline Date: Mon 7/12/04 Page3 BETHEL ROAD I (W. Cify Limits - Freeport Pkwy.) ST 99-05 TrensSystems Corp. $ Project Meeting Received Draft Drainage Report Exeutive Summary and 2 sets of full-size and 2 sets of half-size plans. TrensSystems is to rewse plans to orient north to the top of the sheet and re-submit. 9 Project Meeting Discussed drainage issues - coordination with Grapevine (Lorna Gibson) - Explorer Pipeline 10 Project Meeting Discussed the drainage- slope of the proposed boxes, equalization and clearances between top of culvert and pavement, width of roadway (27' to 25') and median openings at Minyards. E-mailed standard specifications. 11 Project Meeting Discussed the placement of the box culverts between the two houses and whether a Corps permit would be required for the channel. Discussed the ownership of the property - two parcels(Carter-Crawly and Koll) now belong to Coppell, but are under consideration to be developed. Discussed possible construction materials for the channel that would satisfy SWMP and BMPs. 12 Field Meeting Met with Craig Bond and Rudi Reinecke to discuss the channel and Corps requirements. 13 Project Meeting Length of culvert - coordinate with F&N - NWP 13 for culverts spacing of street lights - TS will send plans foundation detail - TS will get the detail gave TS contact list got with Brad Reid on the location of the sidewalk and faxed to C. Bond on Oct. 29 15 Project Meeting Met with Craig bond and Rudi Reineke, the biologist, to detsmine if Stream G1 is jurisdictional waters and he was under the opinion that ~t is. Carp will not allow concrete line channel as recommended by the Drainage Study. Construction of channel will require a permit; probably an individual permit, and mitigation. 17 Project Meeting Met to discuss review comments. Craig Bond & Mike Hobbs 22 CORPS OF ENGINEERS (Alan Plummer, Inc.) 01-29-04 - Met with Loretta Mokry 04-09-04 - permit submitted to the Corps 04-26-04- Project No. 2004 -00181 Project Manager: Jessica Napier 05-04-04 - Loretta called to relay site meeting details with Jessica Napier 06-15-04 - informed TS that the permit is on hold - will construct the roadway portion firet 27 Parcel #1 - Fellowship of Las Colinas (ROW/TCE) September 25~ 2002 - Right-of-way legal description and plat received. December 3, 2002 - received remaining easements. 08-11-03 - Sent letter with copy of easements. 09-05-03 - Craig Stovall left message - wanted to meet about the proposed easements. 09-15-03 - Bred Stovall called. Set up meeting for September 18, 2003. 10-06-03 - offer letter sent. 10-29-03 - sent letter about check and signing of temporary construction easement 11-12-03 - sent letter about check and a copy of temporary construction easement 29 Parcel ~3 - Walter Hogg Partnership (ROW/SE/TCE) September 25, 2002 - Right-of-way legal description and plat received. December 3, 2002 - received remaining easements. 08-11-03 - Sent leffer with copy of easements. 09-30-03 - Larry Futerfas called 10-06-03 - offer letter sent. 04-26~04 - Greg Cannon with TransWestern called to discuss the Walter Hogg property. Wanted to know about the tree ordinance - referred him to John Elias & Marc[e Diamond. 972-361-1123 06-15-O6 - second offer letter sent 30 Initial Contact by City Page4 BETHEL ROAD I (W. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp. 32 34 36 Parcel # 4. DFW Airport(ROW/SE/TCE) 07-01-03 - received easement documents. 08-11-03 - Sent letter with copy of easements, 08-12-03 - Michael Pyles with DFW called and said that the airport property had no problem with the easements and would initiate the acquisition process. 40 year license agreement for the right-of-way and temporary use permits for the temporary construction easements, (972-574-3214) 10-29-03 - sent letter asking for status update on the license agreements and the temporary use permits 10-30-03 - Mike Pyles called and said that he was waiting on Grapevine to submit the documents on their portion of the road, Said we did not have an interlocal with DFW and that they had already refused the license agreement and temporary use permits once. Will submit with Grapevine documents and sea if they will approve. Will try to get us approval to relocate the existing franchise utilities so that we can stay on schedule with the project. 11-12-03 - Mike Pyles called and said that his boss would be getting in touch with the city manager to discuss the political aspects of the land rights acquisition. 01-26-04 - Mike Pyles called to say that right-of-way and easements would be taken to March board - 20 year license agreement. Had originally said 40 year license agreement. 02-16-04 - requested Mike Pyles to make the slope easement temporary. Should go to the Board the first Thursday In March. 03-29-04 - received the license agreement from DFW - sent to City legal to review. 05-07-04 - Meeting with Mike Pyles and DFW attorney to discuss license agreement Parcel #5 - Gulf United Industries (ROW/TCE) September 25, 2002 - Right-of-way legal description and plat reeaived. December 3, 2002 - received remaining easements, 08-11-03 - Sent letter with copy of easements, 08-19-03 - Ross Ramsey called and asked about roadway impact fees and indemnity clause in the temporary construction easement. Talked to Ken and told him that impact fees did not apply and that the right-of-way would be purchased. Faxed him a copy of the standard temporary easement language and asked for comments. 972-393-0922 telephone / 972-393-9227 fax 10-06-03 - offer [effer sent. 10-09-03 - Ross Ramsey requested a time frame on the temporary construction easement. 10-29-03 - Acquired Parcel ~6 - Texas Dugan Limited Partnership (ROW/'TCE) September 25, 2002 - Right-of-way legal description and plat received. December 3, 2002 - received remaining easements. 08-11-03 - Sent letter with copy of easements. 08-12-03 - Steve Rogers with Emerson called and said that Texas Dugan owned parcel. Sent letter with copy of easements to Texas Dugan. 06-17-04 - met with Brook Barefoot to discuse easement - eaid he would check on ownership of this parcel. 39 Parcel #7. Hillwood Investment Properties (ROW/TSE/TCE) Easements are supposed to be dedicated as part of the re-plat. Planning has been in contact with Hillwoed. 09-11-03 - Sent initial contact letter - Planning seid that Hillwood had not indicated that they would be replatting any time soon. 09-25-03 - Hillwood submitted preliminary plat for DRC. Included ROW dedication, 10-03-03 - Jim Witt said that Hillwead would dedicate temporary slope and construction easements by separate instrument. 10-06-03 - letter sent. 01-08-04 - send revised easements to Hillwood. 41 Parcel ~ - Minyard Food Store (ROW/TCE/DE) 07-01-03 - received easement documents 08-29-02 - received drainage easement document 09-11-03 - Sent latter with copy of easements. 09-15-03 -Jim Conine called about the sesements. Faxed and mailed him a copy of the associated plan sheets and aerial photos. 09-23-03 - Jim Conine called about the median opening and the proposed drainage easement, Sent letter. 10-02-03 - Jim Conine called and said his questions were answered. 10-06-03 - offer letter sent. Page5 BETHEL ROAD I (W. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp. 43 Parcel ¢~ - Texas Dugan Limited Partnership (ROW/TCE) 07-01-03 - received easement documents. 08-11-03 - Sent letter with copy of easements. 08-13-03 - Jeff Turner and Brooke Barefoot called to discuss their concerns with the right-of-way acquisition The corner clips and the right hand turn lane may conflict with their monuments and landscaping. 06-17-04 - met with Brook Barefoot to discuss easement. 46 47 Parcel #10 - City of Coppell (ROWfTCE) 07-01-03 - received easement documents. May need to dedicate an additional 10 feet on the drainage easement. The drainage easement is supposed to be 60-feet, but is only 50 foot on this parcel. Parcel #11 - Texas Dugan Limited Partnership (ROW/TCE) 07-01-03 - received easement documents. 08-11-03 - Sent letter with copy of easements. 08-13-03 - Jeff Turner and Brooke Barefoot called to discuss their concerns with the right-of-way acquisition. The comer clips and the rig~ hand turn lane may conflict with their monuments and landscaping. 06-17-04 - met with Brook Barefoot to discuss easement. Parcel #12 CiCi Addition (TCE) 07-01-03 - received easement documents. 08-11-03 - Sent letter with copy of easements. 08-14-03 - Lois Willliams wanted copy of our standard easement documents - asked about an indemnib/clause for anyone hurt on their properly during construction. 972-7454204 fax. 10-06-03 - offer letter sent. 12-03-03 - sent revised TCE with city manager's signature 60 Drainage Utility Schematic Sent Sent schmatic showing the Iocetioo of the proposed boxes. May 21,2003 - Craig Bond inquired about easements along the box culvert under Bethel Road. Told him that the City could acquire prescriptive rights 10 feet on either side of the top of bank. Not much room in between the houses north of Bethel Road. Need more detailed survey information. 61 88% Plan Provided Plans were provided during the utility meeting on November 13, 2003. Plans were sent to those who did not attend on 11-18-03. 62 Explorer Pipeline Met with Explorer Pipeline to discuss the relocation of the pipeline on April 19, 2002. TranSystems is to prepare a sketch of the proposed relocation and obtain a cost estimate from Explorer. TranSyetems and Explorer will do a line locate on the 12-inch steel. TranSystems sent letter to Explorer on June 21, 2002. Waiting on response from DFW. December 11,2002 - received estimate from Explorer to relocate pipeline. Also received copy of their easement. Documents do not agree with the field location of the pipeline. Explorer to research additional easement documents. January 13, 2003 - Explorer provided supplemental agreement showing the existing alignment of the pipeline. 11-13-03 provided Explorer with revised exhibit showing the relocation of the pipe. 03-24-04 - talked with Patrick Nwakoby - told him DFW had agreed to let us have the right-of-way. He will sent revised estimate to TrenSystems. 06-17-04 - Patrick Nwakoby told TS that the City needed to provide a letter stating that Explorer would not be responsible for any damage to the roadway caused by maintenance or repair of the pipline. 06-29-04 - Explorer told TS that in order for the City to remain within 5-foot of the centerline of the pipe, we would have to pay for half of the cost of exposing the pipe for an inspection. Asked TS for a proposal to move a portion of the roadway to the north to get off of the easement. 86 Verizon/GTE June 5, 2003 - submitted plans and permit for the utility relocation. In areas that we do not have right-of-way and may be a conflict with the proposed box culverts at the southeast corner of Freeport. Page6 BETHEL ROAD I ON. City Limits - Freeport Pkwy.) ST 99-05 TransSystems Corp. June 24, 2003 - John Powell {~ 940-321-2263 said they would wait until the City has acquired the ROW before they relocate. I told them that they could not stay under the road on the south side. 67 TXU Communications 68 Brower Design Services July 15, 2002 - Chades Martinez with Brewer Design Services called to discuss the relocations for SW Bell, Metromedia Fiber Network, AT&T, Adelphis, Touch America. Indicated that Power Engineers is no longer designing the relocation for Touch America, Discussed the coordination with Qwest. Sent letter on September 4, 2002 approving the relocation of the utilities to the north of the proposed road. November 7, 2002 - Charles Martinez called to request a copy of the permit they will need to complete. Will send the completed plans to city. He is doing the relocation for SW Bell, Metromedia, and AT&T. Fax number is 972-907-2966. Relocated utilities to the noah, in right-hand turn lane at Royal lane. Richard Kell - MMF - Brower is doing the relocation plans - will send copy - need to schedule utility meeting. 469-951-5737 January 8, 2003 - Chades Martinez called to say that he had completed the relocation plans for SWB, MFN, and AT&T. Will send the plans. March 27, 2003- Charles Martinez called to check on the permit for the utility relocations. Relocations going through corner clip right-of-way that City has not acquired. Waiting on the contractor signature before approving permit, May 9, 2003 - Charles Martinez with Broward Design called - said utility contractor would be in on May 12 to sign permit and start construction, Said that Touch American and Qwest now wanted to go in same trench but that it was too late. Contractor has started the relocations, June 24, 2003 - Jim Bryce with the Holt Company called to say that the sign had been replaced, 71 Metromedia Fiber Network Services (complete) July 15, 2002 - Charles Martinez with Brewer Design called to discuss relocation for SW Bell, Metromedia Fiber Network, AT&T, Adelphia, Touch America. Indicated that Power Engineers is no longer designing relocation for Touch America. Discussed coordination with Qwsat. Sent letter on Sept. 4 okaying the relocation along the north side of the roadway. 72 SW Bell Telephone (complete) July 15, 2002 - Charles Martioaz with Brower Design called to discuss relocation for AT&T, Metromedia Fiber Network, Adelphia, Touch America. Indicated thst Power Engineers is no longer designing relocation for Touch America. Discussed coordination with Qwest. 73 360Net (Touch America) - c/o Power Engineers April 23, 2002 - Alex Abeyta with Power Engineers requested to leave utilities in same location and adjust depths to avoid conflicts with proposed water and storm sewer. In same conduit with Qwest. Sent relocation plans for approval on May 24, 2002. October 25, 2002 - Ron Christlenson called - gave him Quest contacts and sent new set of ptans. (telephone - 303-716-8919) (fax - 303-716-8980) (address- 3900 S. Wadsworth, Suite 700, Lakewood Colorado, 80235) February 14, 2003 - sent letter May 8, 2003 - Kevin McCarthy called - asked about the construction start date - utility contractor for AT&T, SWB, & MFN is supposed to start work on May 12, 2003. January 30, 2004 - met with Don Jackson at project site to look at faci~ites at Freeport and Bethel. June 29, 2004 - Phil Porter called. He willl send set of plans for us to check against our latest revisions. Told him that we would have the updated set of plans in August. 75 Qwest April 9, 2002 - Scott Wbeley with Qwest requested to leave otJlitJes in same location and adjust depth to avoid conflicts with water and storm sawer. Told him there were 20 or more conflicts. July 18, 2002 - Jeremy giddJon with Dynamic Technical cafled to request information on utility relocation. Qwast is Jn the same trench as Touch America - told him he needed to coordinate utility relocation. August 2002 - Paul Gonzales (303-445-7058) Sent letter on September 4 approving the relccatJon along the north side of the proposed road. September 23, 2002 - Brian OmJsh doing the field work - 913-451-9606. November 11,2002 - talked with Paul Gonzales told him that we had not acquired ROW on the north side yet. Could leave under the road Jn those locations. November 20, 2002 - talked with Phil potter at 918-663-7076 - gave him Touch America contact. He will send set of relocation plans December 2, 2002 - plans received from SWP Consultants (Phil Porter) for the relocation. February 14, 2003 - sent letter. March 4, 2003 - Paul Gonzales - telephone call ~ stated that Qwest and Touch Amercia would go back in the same trench. Will wait until beginning on 2004 and when ROW is acquired to relocate. May 12, 2003 - Paul Gonzales called - said contractor for AT&T, SWB, and MFN was telling them they needed to relocate. Too late for Qwest to go in same trench with them - the utilities will not wait another few weeks. May 12, 2003 - Phil Porter with SWB called - wanted to know if his plans were okay. Reviewed plans and sent him comments. May 21, 2003 - talked with Paul Gonzales - wanted to know what they needed to submit to get a permit to go in same trench with AT&T, SSC, and MFN. Teresa told them they could install conduit then submit permit and as-built plans when they pulled wires through conduit. May 22, 2003 - Phil Porter wanted to know what they needed to submit to get a permit to go in same trench as others. Will make changes on previously subm~ed plans and submit with permit for Qwsat Page7 BETHEL ROAD I (W. City Limits - Freeport Pkw,j.) ST 99-05 TransSystems Corp. and TouchAmerica. Page8