SS9901-CS040714 FORCE MAIN LINES "A" & "B" SS 99-01 Turner Collie & Braden 2001 2002 2003 2004 2005 ~1 ~ Q~ Q4 ~ Q1 Q2 Q3 64 Q1 iD Task Name DESIGN PHASE 2 Design 3 Bid Opening 4 City Council 5 U ~, IL}TY ~,.OTIFICA TION$ 6 Dallas Water Utilities 7 City of Irving CONSTRUCTION 9 Preconstruction Meeting 10 Notice to Proceed 11 Meeting 12 Construction (work days) Q~ ~i i Q2 Q3 i Q4 ~ Q~i Q~ Q3 Q4 ~, 2/10 ~k 2/24 4/8 : Project: SS99-01A&B Date: Wed 7/14/04 Summary Deadline Task Mil~stone · Page 1 FORCE MAIN LINES "A" & "B" SS 99-01 Turner Collie & Braden $ 11 12 UTILITY NOTIFICATIONS Utilities were cent plans on april 14, 2003. Meeting Meeting with TC&B, contractor to discuss the revision of plan/profile sheets for directional drilling. Construction (work days) WEEK 1 (April 26 - 38) No work. WEEK 2 (May 3 - 7) No work. WEEK3 (May 10 - 14) No work. WEEK 4 (May 17 - 21) No work. WEEK $ (May 24 - 28) No work. WEEK $ (May 31 - June 4) No work, WEEK 7 (June 7 - 11) No work. WEEK S (June 14 - 18) Contractor dug pilot hole - directional drilling from Station 7+00 to 11+00. Pipe strung from the second median north of Belt Line northward to Bethel School Road. WEEK S (June 21.25) Working on the bore from Sta. 0+69 to 1+49, located in the parking lot of the shopping center. WEEK 10 (June 28. July 2) WEEK 11 (July $ - 9) Pulled the 20-inch pipe from Sta, 7+00 to 11 +00. A portion of the pipe collapsed. Bore operation under fire hydrant dislodged the blocking and the fire hydrant and the assembly dislodged from the main. Worked on the pavement replacement in the shopping center. WEEK 12 (July 12 - 16) Working in first median north of Belt Line where the pipe is collapsed. Page 2