Loading...
WA0101-CS040702Suzan Taylor - Coppe SH 121 water line Page From: To: Date: Subject: "Doug Showers" <DShowers@BHCLLP.COM> <bchandler@brazoselectric.com > 7/2/2004 11:00:44 AM Coppell SH 121 Water line Good Morning Mr. Chandler, This e-mail is to confirm our conversation this morning regarding the Brazos Electric Transmission Pole adjacent to station 15+20 on the referenced project. As you stated the pole foundation was designed to allow for an excavation of 5-foot depth adjacent to the pole. We have prepared our plan and profile to comply with these parameters. As we discussed, the plan sheet will include a note regarding the contractors responsibility to contact Brazos Electric at least 24 hours in advance of excavation local to this pole foundation. We trust that this summarizes the needs of Brazos and the response of the designer to accommodate these needs. We will keep you in the loop as this project proceeds to construction. Sincerely, Douglas K. Showers, P.E. Birkhoff, Hendricks & Conway, L.L.P. 7502 Greenville Ave., #220 Dallas, Texas 75231 Phone: (214) 361-7900 Fax: (214) 361-0204 CC: <staylor@ci.coppell.tx .us>