Loading...
WA9701-MP040715 DENTON TAP WATER LINE (Bethel to Airline) WA 97-01 Birkhoff, Hendricks & Conway 2002 2003 2004 2005 Q1 Q2 Q3 04 Q~ ~ Q3 ~4 Q1 02 ~ ~4 ' ~i 02 Q3 ID Task Name DESIGN PHASE 2 Design 3 95% Plans 4 Meeting 5 Meeting 6 Advertisement 7 Bid Opening 8 City Council 9 PERMITS 10 THC 11 RIGHT -OF-WAY 14 AboveNet (MFN) 24 SBC 25 TXU Gas 26 Verizon · 8/22 · 10/21 · 319 · 10/26 · 11/9 Project: WA 97-01 Task Milestone · Summary ~ Deadline Date: Thu 7/15/04 Page 1 DENTON TAP WATER LINE (Bethel to Airline) WA 97-01 Birkhoff, Hendricks & Conway 4 Meeting Discussed moving the proposed water line into the the median to avoid conflicts with DQ and Dickeys. Take the existing 8" out of service and construct water line in same location. $ Meeting Presented 3 options for the construction of the water line in the median with associated cost estimates for each. Page 2