WA9701-MP040715 DENTON TAP WATER LINE (Bethel to Airline)
WA 97-01
Birkhoff, Hendricks & Conway
2002 2003 2004 2005
Q1 Q2 Q3 04 Q~ ~ Q3 ~4 Q1 02 ~ ~4 ' ~i 02 Q3
ID Task Name
DESIGN PHASE
2 Design
3 95% Plans
4 Meeting
5 Meeting
6 Advertisement
7
Bid Opening
8 City Council
9 PERMITS
10 THC
11 RIGHT -OF-WAY
14 AboveNet (MFN)
24 SBC
25 TXU Gas
26 Verizon
· 8/22
· 10/21
· 319
· 10/26
· 11/9
Project: WA 97-01 Task Milestone · Summary ~ Deadline
Date: Thu 7/15/04
Page 1
DENTON TAP WATER LINE (Bethel to Airline)
WA 97-01
Birkhoff, Hendricks & Conway
4 Meeting
Discussed moving the proposed water line into the the median to avoid conflicts with DQ and Dickeys. Take the existing 8" out of service and construct water line in same location.
$ Meeting
Presented 3 options for the construction of the water line in the median with associated cost estimates for each.
Page 2