Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
WA0002-AG040608
0 CDBG FY 2002 COPPELL FIRE HYDRANTS & WATER MAINS Road & Bridge District No. 4 BID TABULATIONS 4/26/04 AVS Item Description Unit Qty. FIRE HYDRANTS & WATER MAINS I-1 Clearing & Grubbing S.Y. 433 $ 7.00 I-2 Full Depth Sawcutting of Asphalt Pavement L.F. 795 $ 2.00 I-3 Remove Asphalt Concrete Pavement S.Y. 400 $ I4.00 I-4 Remove & Replace Reinforced Concrete Curb L.F. 40 $ 40.00 I-5 Remove & Replace Reinf. Conc. Valley Gutter S.Y. 5 $ 100.00 I-6 HM.AC. Ty. "D" Fine Grade Surf. Course TONS 137 $ 70.00 I-7 FIowable Backfill w/1,200 PSI Max. Compr. Str. C.Y. 350 $ 80.00 I-8 8" PVC Water Cl. 200 incl. Compact D.I. Fittings L.F. 886 $ 51.00 I-9 6" PVC Water Cl. 200 incl. Compact QI. Fittings L.F. 40 $ 41.00 1-10 Bore for S" PVC Water incl. 8"PVC&Enc. Pipe L.F. 114 $ 195.00 1-11 8" Gate Valve EA. 3 $1,200.00 1-12 6" Gate Valve EA. 3 $1,000.00 1-13 8" x 8" Tapping Sleeve & 8" Gate Valve EA. 2 $2,600.00 1-14 Fire Hydrant w/Concrete Thrust Blocking EA. 3 $ 2,200.00 1-15 Temporary Traffic Control Plan L.S. 1 $ 2,000.00 1-16 Install and Remove Drop Inlet Protection EA. 1 $ 300.00 1-17 Install and Remove Silt Fence L.F. 500 $ 2.00 1-18 Trench Safety Plan & Trench Systems L.S. 1 $1,500.00 1-19 St. Augustine/Bermuda BIk. Sod. (incl. Watering) S.Y. 280 $ 4.00 1-20 Seeding for Erosion Control (C.EMS.)(incI. Wat.) S.Y. 300 $ 2.00 1-21 Point Repair of Private Water Main (Loc. Unknown) EA. 8 $ 700.00 1-22 Point Repair of Private Water Svc./Irri. Line (Unk.) EA. 22 $ 300.00 1-23 Point Repair of Private Sanitary Sewer Main (Unk.) EA. 8 $ 500.00 1-24 Point Repair of Private Sanitary Sewer Svc.(Unk.) EA. 22 $ 280.00 1-25 10" x 8" Tapping Sleeve & 8" Gate Valve EA. 1 $ 3,500.00 SUBTOTAL MISCELLANEOUS 7000 Partnering Workshop L.S. 1 $ 5,800.00 SUBTOTAL TOTAL Bids Received are on the Unit Price Basis from Estimated Quantities. Bids have been Tabulated and Verified by Dallas County Public Works: ;/1 - lowest (rec'd. Bond) North Texas Contracting Unit Cost Amount #2 (rec'd. Bond) JS Constructors Unit Cost Amount #3 - highest (rec'd. Bond) East Texas Contracting Unit Cost Amount $ 3,031.00 $ 14.00$ 6,062.00 $ 2.00 $ 866.00 $ 1,590.00 $ 3.00 $ 2,385.00 $ 3.50 $ 2,782.50 $ 5,600.00 $ 10.00 $ 4,000.00 $ 7.00 $ 2,800.00 $ 1,600.00 $ 28.00 $ 1,120.00 $ 19.00$ 760.00 $ 500.00$ 51.00 $ 255.00 '$ 29.00 $ 145.00 $ 9,590.00 $ 88.00 $ 12,056.00 $ 91.00 $ 12,467.00 $ 28,000.00 $ 50.00 $ 17,500.00 $ 50.00 $ 17,500.00 $ 45,186.00 $ 49.00 $ 43,414.00 $ 97.55 $ 86,429.30 $ 1,640.00 $ 46.00 $ 1,840.00 $ 97.00 $ 3,880.00 $ 22,230.00 $ 175.00 $ 19,950.00 $ 158.00 $ 18,012.00 $ 3,600.00 $1,380.00 $ 4,140.00 $ 749.00 $ 2,247.00 $ 3,000.00 $1,000.00 $ 3,000.00 $ 540.00 $ 1,620.00 $ 5,200.00 $2,500.00 $ 5,000.00 $ 2,340.00 $ 4,680.00 $ 6,600.00 $2,650.00 $ 7,950.00 $2,250.00 $ 6,750.00 $ 2,000.00 $3,500.00 $ 3,500.00 $ 400.00 $ 400.00 $ 300.00$ 300.00 $ 300.00$ 450.00 $ 450.00 $ 1,000.00 $ 2.25 $ 1,125.00 $ 2.75 $ 1,375.00 $ 1,500.00 $3,000.00 $ 3,000.00 $ 500.00 $ 500.00 $ 1,120.00 $ 6.00 $ 1,680.00 $ 5.50 $ 1,540.00 $ 600.00 $ 1.25 $ 375.00 $ 4.80 $ 1,440.00 $ 5,600.00 $ 450.00 $ 3,600.00 $ 400.00 $ 3,200.00 $ 6,600.00 $ 560.00 $ 12,320.00 $ 260.00 $ 5,720.00 $ 4,000.00 $ 840.00 $ 6,720.00 $ 400.00 $ 3,200.00 $ 6,160.00 $ 850.00 $ 18,700.00 $ 300.00 $ 6,600.00 $ 3,500.00 $2,700.00 $ 2,700.00 $2,940.00 $ 2,940.00 $169,747.00 $ 182,692.00 $ 188,303.80 $ 5,800.00 $5,000.00 $ 5,000.00 $ 500.00 $ 500.00 $ 5,800.00 $ 5,000.00 $ 500.00 $175,547.00 $ 187,692.00 $ 188,803.80 Abel V. Salda~a, P.E., Project Manager AO