Loading...
PA9702-LR 990714 (2) CONCRETE COMPR SIVE STRENGTH TES- 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S147 Date of Serviee: 06/09/1999 Report No.: 9915832 Report Date 07/14/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Bra id 732 DeForest 300 Block of Parkway BIrd Coppell TX 75019 Coppell, Texas/P~. ~)6051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: (6 Sack) CONCRETESUPPLmm NelsonBrothers PLACEMENT DATE: 06/09/1999 BATCH TIME: ll:57am pLAhrr: Lewisville TEv~ SAIVB'LED: 1: 15pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair mNGTB: 4000 psi @ 28 Days TEMPERATURE ~. Am 90 F CONCRETE: 90 F SLUMP: 4-6" TRUCK blO: 208 TICKET NO: 73176 ~kne N/A ~tmcos3Tsr(~): N/A UhTrw~xGffr(p~: N/A TEST METHOD: ASTM C- 143 pLACEMERr LOCATION: (12) Indoor pool pleas all 18" w/48" bell, and (2) diving pool piers 18" w/48" bell,(12) ASTM C- 172 Indoor pool pier~ ~ H.3-8.5, 9-11, 12.4, 12, H.5-8.5, H.9-8.5, 9-12 (Se~ below) ASTM C-39 SAMPLE LOCATION: NEcomer pool pier@H.3 ~ 12.~- REPORT OF TESTS Acct n n Y^gos: 30 CYLINDER MEASURED MAXIMUM COMPRESS1VE MAiD SLUMP DATE AGE LOAD $TRENGTIi FRACTURE SET NO. (inches) TESTED (days) ~ force) (psi) TYPE 1 1 5.00 0~/16/1999 7 120110 42~0 1 2 5.00 06/16/1999 7 117850 4170 Average 4210 1 3 5.00 07/07/1999 28 175810 6220 1 4 5.00 07/07/1999 28 173100 6120 Average 6170 P~acement location continued: (2) Divincj pool piers ~ designation #7, #8, Note: H.5 ~ 12.4 and H.9 ~ :~2.4 are still back~illecL will be dri:~led at a later date. This relxla is exclusively for file use of file client indicated above and shall not be reproduced except in full without the wltten approval Of HBC Engineering inc. 0ILL Page I of 2 'Report No.: 9915832 ~.~,~ Note: First load rejected 0 2 hours, pump truck plugged, actual concrete placement was at 11:15 am. Technician: Mike Odom Started: 9:00am Fm~h~: 4:30pm H]C En 'neering, Inc. ( 1 ) City of Coppell ( 1 ) City of Coppell - Engineering (I) Brlnkley Satgent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour (I) Tura~ Eaginecrs (1) City ofCoppell - Leisu~ Serf Dept Vice President (I) Hisaw & Associates This r~po~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 2