WA0002-CN040330214 $5~ 6445
"EXHIBIT A"
TEAM CONSUL TANTS, INC.
WORK ORDER NO. 11
L4.BOI~TORY SERVICES CONTI~4CT (IIVDEFINITE DELI'FERY, INDEFINITE QU.4~VTI'~')
Work Order Number 11 , Project Number Grant No. B-02-UC-480003 Date: 'March 22. 2004
Pursuant to Comm/~toners Cour~ Order Number 2001-1223 dated $1me 26, 2001, & con~'~ct for hb~atory s~rvic~
(For ladeFm/tc D~livery, Qu~ntityXOne Year) w~ awarded to ~ Comultaats, Inc., and r~new~d or ~mcnded
by Cou~ Orders 2002-1~$, 2005-$71 tad 200~-784:
I. L~or~tory a~cel to perform requested sm'~lces in compUance w~da ~ ~ ord~ ~ con~ for
~o~to~ se~ces for ~e Gol~a ~ Moab Ho~ P~ ~t No. B-2-U~8~03. Pe~o~ e~wo~ te~ u ~ess~ for q~li~ c~l of coercion.
A. Pe~o~ l~ ~b~afion ~s~ I~ neces~ fo~ quali~ consol ofco~cfion
B. Pavcmen~s~c~al Concrete and b/~o~ tes~ ~ ~c~s~ for q~ ~1 of
coercion.
· , ~e set of blue l~e p~ of ~e project com~cfion p]~ and one set of spec~ca~om ~ be pro~d by
~1~ Co~.
~. Mlx~ ~t of ~ Work ~d~ s~1 not ~ce~ $2,435.~ ~ess ~ ~r con,ct
~c~ca~o~, F~ds ~e to ~ ox~nd~ ~o~ Coppell CDBG Fire ~drant FroJect 09413
Dallas County point of contact: Able Saldana, P.E., Project Manager, 214.653.7151, Fa~: 214.653.6445,
ermih U~.
I. ACCEFTED BY THE LABORATORY:
Title
RECOM1V/ENDED BY:
~hmn.ing
Abel $~ldaaa, P.E,
Project Manager
JUL--06--04 O1 ;50 PM PUBLIC ~ORKS 214 65S 6445 P. 04
M~r ~ 04 06:55~ TEflM Consultants ~143314458 P-~
TEAM Consultants, Inc.
Geotechnlcal, Environmental, Construction Materials Testing
March 19, 2004
TEAM P~oject No. 045086
I~. Able Saldana P.E.
Dallaa County Public Works
411 Elm Street, 4th Floor
Dallas, TX 75202
FY2002 Golden T~lanol~ Mobile Home Park
Dear Mr. Saldana:
· .In accotdanc.e w/th your requeat, wc have p~pa~l the a~h~ ~st ear, ate for
~vldmg Coaactton Materials.Tes~ng Se~ices for ~c a~ve ~f~reo~d p~t. '~
~ima~ ~i~ ~e ~ed on ·revtcw oft~ pl~ s~c~fio~, ~a o~nc~m
this ~e of ~j~l. You will only be bdled for s~l wor~ ~Io~ea m a~om~ce
with thc ~t prices ~ ~.
The contact personnel for thc above referenced project are:
Dispatch: Mr. ~osh Majors
C~ ~ger; Mr. Tim Woolly
Q~QC Md: Mr. Brace Welton
.We are pleased to have the opportuniW to submit thi.s proposal and. look forward.
to work~ng with you on this project. If you find this proposa~ acceptable, piens~ s~n aaa
I'emrn one copy for o~ files. Our General Conditions ge attsched.
Sincerely,
BW/ke
Attachments:
Authorized By:
TEAM Consul~c~.,
Bruce Walton, Supervisor
Quality Aasurnnee/Qunli~ Con,roi
Cost Estimate
Date;
297¢1 $. Wctltots Wt~t~.¢s; Suittt I01 Dallas. ITl ?$211
.~tlOI Pl~,~t.~tt ~tlle); Suite I01 Arli~gton. TX 7611~ 1817J
COURT ORDER
2004,590
DA :, MAR 3 0 200 ,
STATE OF TEXAS
COUNTY OF DALLAS
BE IT REMIIMBERED, at a regular meeting of thc Comrnissioners Court of Dallas County, Texas, held on
the ~0th day of Narch
· 2004, on motion made by P. ike cant-~ll, District %2 ,
and seconded by Kenne~_h A. l~l~ield, Dis~.~i~: #4
, ~he following order was adopted:
porsu~nt to Cou~ Order No. 2001-1223 dated Sune 26, 2~01. Commissioners Cou~t authorized a coairact for
laboratory services for Indermite Delivery, One Year, with TEAM Consultants, hc., which was renewed or
emended by Court Orders 2002-1646, 2003-571 and 2003.754; and
WHBRBAS,
WHEREAS,
V~tER,EAS,
the Oolden Triangle Mobile Home Pa~k CDBG Project Onmt No. B-02-UC-480003, is presently commcncin~
construction and needs materials testing seivices ~ e~su~e quality; and
TEAM Consultants, Inc., has agrccd to perform the necessary work as detailed in Exht'bit A ~f the attached Work
Order No. 11 for an amount not to exceed $2,455,00; and
The Director of Public WorkS recommends that the attached Work Order No. 11 be executed.
iT IS THERI/FOIt~ ORDERED, ADJUDOED AND DECREED by thc Dallas County Corrun/ssioners Court that TEAM Co~s~lllsllis,
Inc., is hereby authorized end directed to perform requested n'mterials tesling ser'Aces as dctailed in the attached Work Order No. 11
in ,- amount not to exceed $2,455.00 to he paid fzom CDBO Coppell Fi~e Hydrant Project 09413.
DONE IN OPEN COURT, h'fis 30th day of_ l~u:ch ,2004.
~~)d~pprovah ~ ~e~__ .