Loading...
SS9901-PS040618 · itien~e' ~fi~,ca~ · LIVING · JUNE 18, 2004 Public l eeting L.'alleO to Kevlew sewer System Plan As part of the upgrade to its sanitary sewer system, the City of Coppell has recently awarded a contract to MasTec North America, Inc. to install a new sanitary sewer force main in the median of MacArthur Boule- yard from Deforest Road to Vil- lage Parkway. At Village Parkway, the main will proceed in an easterly di~ rection to the city's pump sta- tion and then proceed southerly across Sandy Lake Road to the existing sanitary sewer lift sta- tion, behind the vacant shopping center at the southeast comer of MacArthur and Sandy Lake Road. The technique that the con!ractor will be utilizing on this project is directional drilling, se- lected over the open-cut method to minimize the impact on exist- ing trees and landscaping within the median. A trade-off is that the equipment associated with see MEETING on pago 23 MEETING from page 1 rectional drilling is quite large and at times noisy. l'he City has scheduled a neigh- borho0d meeting for Saturday, June 19, from 10:00 a.m. until noon for citizens to visit the site to view and hear the equipment and discuss the overall logistics of the project. Construction will begin June 2004 and continue through March 2005. Motorists should expect de- lays and seek alternate routes. For questions contact Rick · O'o~II, uity inspector, at 972-304- 7090 or 972-304-3679.