Loading...
SS9901-PS040612 T H E C I T Y 0 F COPPEL£ RE: Neighborhood Public Meeting Deforest Road Lift Station Improvements Force Main Line 'D' DATE: TIME: PI.ACE: Saturday, June 19, 2004 10:00 AM until Noon Village Parkway (between MacArthur and Kimbel Kourt) by Lakeside Elementary As part of thc upgrades to our sanitary sexvcr system, the City of CoppelI has recently awarded a contract to MasTec North America, Inc. to install a new sanitary sewer force mare in the median of MacArthur Blvd. from Delbrcst Road to Village Parkway. At Village Parkway, it will proceed in an easterly direction to the city's pump station, and then proceed southerly across Sandy Lake Road to the existing sanitary' sewer lift station, behind the vacant shopping center at the southeast comer of MacArthur and Sandy Lake. The technique that the contractor will be utilizing on this prqiect is directional drilling. The directional drilling option was selected, over the open-cut method, to minimize the impact on existing trees and landscaping within the median. The trade off is that the equipment associated with directional drilling is quite large and at times noisy. Therefore, the city has scheduled a neighborhood meeting for Saturday, June I9, 2004 fi'om 10:00 a.m. until noon for citizens to visit the job site to view and hear the equipment, and to discuss tlne overall logistics of the project. I hope you will be able to attend this meeting to become more familiar with the project. Sincerely, '/ ~Griffin, P.E. Director of Engineering & Public Works Office 972/304-3686 e-mail kgri [fiIUrz'ci.coppell.tx.tts CC: Jim Witt, City Manager Clay Phillips, Deputy City Manager 1600 households in Coppell DAVID & LAUREN LIVINSON 940 PINTAIL CT COPPELL TX 75019